My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
4315
>
2300 - Underground Storage Tank Program
>
PR0231760
>
INSTALL 2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2019 8:33:37 AM
Creation date
8/21/2019 3:51:37 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2005
RECORD_ID
PR0231760
PE
2351
FACILITY_ID
FA0003831
FACILITY_NAME
WATERLOO FOODMART
STREET_NUMBER
4315
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95215-2305
APN
08710034
CURRENT_STATUS
01
SITE_LOCATION
4315 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix A <br /> Health and Safety Plan <br /> • Safety supplies and equipment inventory onsite <br /> • Training programs and hazard communication <br /> • Procedures for reporting accidents or incidents <br /> The Project Manager has the authority to suspend work any time he or she finds that the provisions <br /> of the HSP are inadequate for worker safety. <br /> SAFETY AND ORIENTATION MEETINGS <br /> Field personnel from Walton and its contractors/subcontractors will attend a project specific training <br /> meeting for safety issues and review the project tasks before beginning work. The meeting will be <br /> led by the Project Manager. <br /> HAZARDOUS MATERIALS PRESENT <br /> Previous soil investigation work at the site has shown that the site's subsurface soil and groundwater <br /> are not contaminated with gasoline or benzene. <br /> GENERAL PROJECT SAFETY REQUIREMENTS <br /> Project activities will be conducted in accordance with the following minimum safety requirements: <br /> Eating, drinking, and smoking will be restricted to a designated area. The Project Manager will be <br /> responsible for taking necessary steps to protect employees from physical hazards, including: <br /> • Falling objects, such as tools or equipment <br /> • Falls from elevations <br /> • Tripping over hoses,pipes,tools, or equipment <br /> • Slipping on wet or oily surfaces <br /> • Insufficient or faulty protective equipment <br /> • Insufficient or faulty equipment or tools <br /> PROTECTIVE EQUIPMENT REQUIREMENTS <br /> Field personnel and visitors are required to wear the following clothing and equipment, as a <br /> minimum, while in the work area of the project site: <br /> • Long pants <br /> • Safety glasses <br /> • Shirt <br /> • Leather work boots <br /> Walton Engineering <br /> Walton 077-013.hsp 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.