My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
4315
>
2300 - Underground Storage Tank Program
>
PR0231760
>
INSTALL 2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2019 8:33:37 AM
Creation date
8/21/2019 3:51:37 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2005
RECORD_ID
PR0231760
PE
2351
FACILITY_ID
FA0003831
FACILITY_NAME
WATERLOO FOODMART
STREET_NUMBER
4315
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95215-2305
APN
08710034
CURRENT_STATUS
01
SITE_LOCATION
4315 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix A <br /> Health and Safety Plan <br /> WORK ZONES AND SECURITY MEASURES <br /> The Project Manager will contact Underground Services Alert(USA)and the utilities will be marked <br /> before any excavation is conducted onsite. Excavation work will be performed at a safe distance <br /> from utilities. The areas of excavation will be designated as Exclusion Zones. Only essential <br /> personnel will be allowed into an Exclusion Zone. <br /> Barricades will be used to deny the public access to these Exclusion Zones. The public will not be <br /> allowed close to the work area under any conditions. If for any reason the safety of a member of the <br /> public (e.g., motorist, pedestrian, etc.) may be endangered, work will cease until the situation is <br /> remedied. All combustion equipment will be clean and in good working order. All state and local <br /> safety requirements, including traffic control, are to be observed during construction. <br /> Excavation work will proceed in a manner designed to reduce the creation of airborne dust to the <br /> extent reasonably achievable. <br /> EMERGENCY RESPONSE PROCEDURES <br /> In the event of an accident resulting in physical injury, first aid will be administered and the injured <br /> worker will be transported to the nearest hospital or emergency medical clinic for emergency medical <br /> clinic for emergency treatment. A physician's attention is required regardless of the severity of the <br /> injury. <br /> In the event of a fire, explosion, or property damage, the nearest Walton office(West Sacramento) <br /> will be immediately notified. If necessary, local fire or response agencies will be called. <br /> EMERGENCY TELEPHONE NUMBERS <br /> Fireand Police.............................................................................................................................911 <br /> St. Joseph Medical Center <br /> 1800 N. California Street <br /> Stockton, CA 95204.................................................................................................(209) 943-2000 <br /> Directions to the Hospital:Exit the facility to the Left onto Waterloo Rd. Travel 1.8 miles and turn <br /> Right on E.Harding Way. Travel 1.1 miles and turn Right on N. California St.Travel 0.2 miles and <br /> arrive at hospital. Travel time 7 minutes. <br /> ADDITIONAL CONTINGENCY TELEPHONE NUMBERS <br /> Walton Engineering, Inc. (West Sacramento)...........................................................(916) 373-1152 <br /> Walton Engineering <br /> Walton 077-013.hsp 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.