My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
455
>
2900 - Site Mitigation Program
>
PR0542310
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:20:01 AM
Creation date
9/3/2019 11:40:02 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0542310
PE
2950
FACILITY_ID
FA0024297
FACILITY_NAME
SAN JOAQUIN LUMBER COMPANY
STREET_NUMBER
455
Direction
E
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23337007
CURRENT_STATUS
01
SITE_LOCATION
455 E ELEVENTH ST
P_LOCATION
03
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Health and Safety Plan <br /> 455 E lith St <br /> Tracy,California <br /> 4.4 Chain of Command <br /> Figure 1. Project Personnel Structure <br /> Corporate Health and Safety Officer <br /> Project Manager <br /> Project Leader/SSHO <br /> Subcontractor Project Manager <br /> Subcontractor Site Workers <br /> 4.5 Training <br /> Field personnel engaged in project operations that potentially expose them to hazardous <br /> wastes, hazardous substances, or any combination of hazardous wastes or hazardous <br /> substances shall have satisfied the requirements of 8 CCR 5192(e)through completion of: <br /> • Initial 40-hour HAZWOPER training, and <br /> • Annual 8-hour HAZWOPER refresher training current within one year. <br /> 4.5.1 General Site-Specific Training <br /> All potential field personnel will review this HASP before commencing work which will serve as <br /> site-specific training.The SSHO will review the HASP before field operations begin and the SSHO, <br /> or designee,will conduct daily tailgate safety meetings (i.e. pre-entry briefings)to bring up <br /> appropriate health and safety concerns and discuss any changes in field conditions.The SSHO <br /> will conduct additional pre-entry briefings with entrants to the site who are not present for the <br /> tailgate safety meeting. Field personnel will certify their review by signing a HASP <br /> acknowledgement form (Appendix B). <br /> Any additional site-specific safety concerns such as, noise, heat illness prevention,or lock- <br /> out/tag-out will be addressed by the Project Manager and the SSHO will be provided with <br /> proper Site-specific training with accordance with any Cal/OSHA regulations prior to the start of <br /> the project, as applicable. <br /> Terraphase Engineering Inc. Appendices <br />
The URL can be used to link to this page
Your browser does not support the video tag.