Laserfiche WebLink
0 . 0 <br /> Office Number: (510) 645-1850 x38 <br /> Cell Number: (925) 719-5496 <br /> Project Manager:Andrew Lojo <br /> Office Number: (510)645-1850 x77 <br /> Cell Number: (510)703-5696 <br /> Project Leader/SSHO: Laurie Israel <br /> Office Number: (916) 594-8499 x39 <br /> Cell Number: (916) 293-1347 <br /> Contractors <br /> Penecore Drilling, Inc. <br /> Office Number: (530) 661-3600 <br /> 4.0 SAFETY MEETINGS <br /> All workers permitted access to the site will receive a site orientation briefing and a review of pertinent <br /> aspects of the project and HASP before the start of work. Personnel will sign a form (Appendix B) <br /> documenting they have had an opportunity to review the HASP, understand the requirements,and <br /> agree willfully to adhere to the safety aspects of the plan. <br /> The site orientation briefing will include the following aspects: <br /> • Key personnel and responsibilities <br /> • Site hazards(known and potential) <br /> • PPE requirements <br /> • Emergency procedures (including signals,evacuation locations,and what constitutes an <br /> emergency) <br /> • Location and route to the nearest medical facility <br /> • Incident reporting procedures <br /> 5.0 PERSONAL PROTECTIVE EQUIPMENT <br /> PPE in the form of protective footwear and appropriate work clothing are required for all field activities. <br /> PPE for specific field activities is listed below. <br /> All Field Activities <br />