Laserfiche WebLink
I UP Fro <br /> SMIMM <br /> MR, y. <br /> IMM <br /> a. <br /> i <br /> Stewart's Beacon <br /> d <br /> Remedial Action Plan <br /> Page: 4 <br /> 3.3 Ground Water Pumping <br /> 3.3.I Pumping and Storage <br /> Geol.gical Technics proposes to extract a volume of ground water for the <br /> p°.rpose of mitigating the levels of ground water contamination that exist <br /> "r�Ohrl around the tanks. During excavation,a lot of contaminated soil will be mixed <br /> 1 with the ground water and will significantly increase ground water <br /> VIJ contamination. Therefore,to help reduce this effect,it is proposed to pump up <br /> to 10,000 gallons of water from the excavation before it is backfilled. <br /> 1 <br /> 3.3.2 Storage,Treatment,and Disposal <br /> r The pumped water will be temporarily stored on-site in a large tank. After the <br /> water is pumped into the tank,it will be filtered through carbon adsorption <br /> units to remove all petroleum hydrocarbons. After the water has been filtered, <br /> r <br /> it will be released into the Tracy city sewer system.: Water samples will be -5TX` c <br /> collected before and after the carbon units and tested for TPH to evaluate theme <br /> efficiency of the filtration system and to ensure that no petroleum hydrocarbons <br /> are being released into the city sewer. <br /> ~ A permit for release of this water will be obtained from the city of Tracy before <br /> the water is released to the system. A copy of the permit will be sent to the <br /> County. <br /> 4.0 PROPOSED FUTURE ACTION <br /> 4.1 Ground Water Assessment Phase II <br /> A work plan for the second phase of ground water assessment has already been <br /> ..e <br /> submitted to the County and the RWQCB in Sacramento. This work plan will begin <br /> after it has been reviewed by the two agents and after the contaminated soil has been <br /> excavated,mitigated,and disposed of. <br /> 4.2. Ground Water RAP <br /> y A ground wafer remedial action plan will be developed after the phase_1I-assessment_ -- <br /> -has been completed.-The County-will be kept informed on the progress of this project. <br />