Laserfiche WebLink
j Stewart's Beacon Property <br /> Phase lI-Greund Water Assessment Proposal <br /> Page: 2 <br /> 3.0 PROPOSED WORK PLAN <br /> Geological Technics proposes to install four monitoring wells. location of each proposed <br /> monitoring well is shown in the Site Map(Figure 2). The placement of these monitoring wells <br /> were chosen to best define the plurnes'dimensions. Since ground water gradient is to the north, <br /> geoxind water contamination will also move in that direction. The north boundary of Stewart's <br /> r roperty is only 90 feet from the tank. Monitoring well#1 was placed 50 feet north of the tank, <br /> leaving 40 feet between known contamination and the property boundary. Geologic,a!Tmhrdrs <br /> proposes to place these monitoring wells north of Stewart's property in hopes That the outer <br /> limits of the contamination can be found with a minimurn expenditure. <br /> Monitoring well#4 should be placed at least 120 feet down gradient(north)of the tank. MW#6 <br /> wit!be placed to the west of MW#4 in an arc corresponiing wit; MW#4. If slgnific:t <br /> contandnation is dztec.ed in any of these wells,additional wells may have to be installed to <br /> identify the.limits of the plume- <br /> These two monitoring wells(installed into the first aquifer)w- be constructed as follows. <br /> a Each well will extend to the bottom of the first aquifer and will be seated into the lower <br /> bounding clay layer at about 2C feet clef.,. The well casing infill be of 2-inch threaded joint PVC <br /> casing,factory periorated wish 0.04-inch slots. Perforations will extend no higher then 5 feet „ <br /> ✓ tt�;ow ground surface. The filter pack will be composed of medium aquarium sand and will <br /> extend from the buttom of the well through the perforated zone to about 1 foot above the <br /> perforations. An annular seat compose of bentonite will be plate above the filter pack. A <br /> surface seal of concrete will be placed above the annular sial and the well will be secured with <br /> a locking well cap ard water tight well cover. Figure 4 illustrates the general construction plan <br /> of these shallow mcaitoring wells. A hollow stem auger drill rig will be used for installation. <br /> ' r ! During drilling,soil samples will be collected to characterize the strata and correlate this <br /> work with the previous investigation. <br /> The monitoring well designed to test the second aquifer(MW#5)will be placed north of the <br /> tank,outside the upper aquifers contamination plume. Therefore,the location of this well will <br /> not be finalized until after the other wells have been installed and tested. If contamination <br /> does not occur in MW 44,it will be located adjacent to MW 44 as shown in Figure 3. <br /> In constructing this well,the upper aquifer will be caseL,•cfore drilling through the aquitard <br /> into the second aquifer(Figure 5). A large diameter hole will be drilled to a depth o`.xbout 21 <br /> feet using a 10-inch auger. The depth may vary slightly depending on the ground surface <br /> elevation and the depth of the interface between the sand(first aquifer)and the clay <br /> (aquitard)layer. Stewart's property has 2 to 3 feet of fill on its north side to level the <br /> property. After this hole has been bored,the auger will be removed and an 8-inch PVC casing <br /> (schedule 80)will be installed into the hole. The casing will be driven info the aquitard a <br /> distance of 1 foot forming a water-tight seal. This will isolate the upper water layer from the <br /> drill hole and prevent an interchange of ground water between the two aquifers. <br /> continue.down-through.the.second_aquifer_with.a.7.25-inch hollow_stem auger._______._.__— <br /> Continuous split spoon sampling will be performed through the second aquifer into its lower <br /> bounding day layer. Into this hole a 2-inch monitoring well will be installed. It will be <br /> N111 1111 mill Ing <br /> �� . <br />