My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012689
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
515
>
3500 - Local Oversight Program
>
PR0544792
>
ARCHIVED REPORTS XR0012689
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:09 AM
Creation date
9/3/2019 11:55:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012689
RECORD_ID
PR0544792
PE
3528
FACILITY_ID
FA0004849
FACILITY_NAME
BILLS BAIT & BEACON GAS
STREET_NUMBER
515
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
CURRENT_STATUS
02
SITE_LOCATION
515 W ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
277
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
l. <br /> Stewart's Beacon Property <br /> Phase II-Ground Water Assessment Proposal <br /> J <br /> Page- 3 <br /> perforated(0.04 inch slots)from the bottom of the hole up to one Foot above the aquifers upper <br /> surface. Tite filter pack will be constructed of aquarium sand that will extend 2 feet above the <br /> the perforations. An annular seal of bentonite grout(Quick Gel&Benseal)will be installed <br /> above the sand pack and extend to within 3 feet of the surface. A surface seal will be formed of <br /> concrete and a water tight well cover. The well casing will be secured by installing a locking <br /> cap, Design of this well is illustrated in Figure 4. <br /> After monitoring wells 4 and 6 have been installed,they will be developed and sampled as <br /> descry in sections 4.8 and 4.9. The first three monitoring wells(MW#1 thru 3)installed <br /> during phase 1 will also be purged and sampled.On the monitoring well installed into the <br /> a second aquifer(MW#5);a time-endurance ground water sampling test will be run. This is <br /> accomplished by pumping the well continuously for several hours during which Bound water <br /> samples are periodically collected throughout the test. The purpose of this is to draw water <br /> from as large a radius as possible by creating a cone of depression with an ever enlarging zone of <br /> influence. :All ground water samples will be analyzed for gasoline,benzene,toluene,and <br /> xylene,(BTX by EPA method 602)at a California certified laboratory. <br /> Monitoring well tops will be surveyed for their elevation,above mean seal level(MSL) This s <br /> ;> data will be used to calculate water gradient. For the purpose of eiaivating ground water <br /> gradient,depth measurements will be collected after ,veil installation,after development and <br /> —�' sampling,and two to four weeks after installation. It is also recommended that gradient be ' <br /> monitored quarterly for one year to track the flow of ground water. <br /> Once this phase of investigation has been completed,the data will be reviewed with the <br /> client. If no additional work is needed a report will be written which integrates data from both <br /> phases of study and makes recommendations for further action. <br /> 4.0 QUALITY ASSURANCE PROGRAM <br /> The following measures will be taken by Geological Technics to insure that a high quality <br /> study is conducted and that cross contamination does not occur. <br /> .. 4.1 Equipment <br /> Monitoring well Irjrin4.t will be drilled with a 7.25-inch and a 10-inch(o.d.)hollow <br /> stem'continuous flight auger,owned and operated by Osterberg and Stewart,Inc. Soil <br /> samples will be collected using a 2-inch(o.d.)modified California split spoon sampler <br /> lined with brass sample tubes. <br />
The URL can be used to link to this page
Your browser does not support the video tag.