Laserfiche WebLink
Work Plan <br /> Stewart's Beacon <br /> Project No.01-17.1.2 <br /> —. Marcia 12,1990 <br /> Page: 2 <br /> moved south of the tank, but bias moved at least S0 feet to the north. Soil <br /> contaminati4a has two modes o:dispersal: that migrating out directly from the tares, <br /> and that which is dispersed by ground water moverriert. The cross section given in <br /> fig=3 shows the contamination distribution. Soil and ground water.analytical data . <br /> generated during the preliminay investigation hrs leen su-nunarized in Table.. <br /> 2.2 ,summary of Tank Removal <br /> Subsequent to this assessment,all three undei7wi d fuel storage tanks were removed by <br /> Western Meter Service of Stockton,California on 20 December 1988. Seal and ground <br /> water samples were-collected by California Water Labs, Inc. a-3 the detection of <br /> Cynthia Wagner of SanJoaquin Local Heaith Department. That data has been <br /> summarized in Table 2. Soil excavated during tank closure•was stockpiled on site. <br /> 2.3 ]Hlrtory of Site Monitoring <br /> The soil excavated during tank closure in Der-ember of W388 was tested for petroleum <br /> hydrocarbons. Three samples were collected in January 1990 for each composite sample <br /> a=id were collected from the center of the pile by digging dawn with a backhoe. An <br /> „ estimated 250 yds-3 was in the stockpileand _eQmpsite samples were analyzed. The <br /> analytical data from these samples indicate that no petroleum hydrocarbons occur in ; <br /> this material. Copies of the lab reports are given'In Appendix A,samples GT soil <br /> 1A,B,C to Gt-18 soil 5A,B,C. <br /> During early ranuary 1990,the three monitoring wets were redeveloped,purged,and <br /> sampled. These samples were tested for petroleum hydrocarbons and the data is <br /> presented in Appendix A, sample number GTI$-MWl to GT18-MW3. Only MWl <br /> contained hydrocarbons which are at levels higher then they were in May 1988. <br /> However,since we do not have data points between May 1988 and January 1990,it is <br /> difficult to put these two data sets in a larger perspective. <br /> - A water sample was also collected from the sump that was used to dewater the <br /> excavation before the reexcavatlon occurred. That sample was collected after the <br /> _ — water in the excavation recharged and had reached equilibrium. its sample number is <br /> GTIS sump and is presented in Appendix A. This data shows that the water which <br /> recharged the excavation contained very little hydrocarbons. <br /> 2A Summary of interim Sall Remediation <br /> On 3 January 1990,SE6MO initiated thu soil remedlation work plan by widening and <br /> deepening the tank excavation, 'rhe excavation contained ground water to a level of <br /> - _ ___�abaut 1D or]i fact belawi�-surfarw:-A dpwawring-process-was-inidated.to-facilitate- -- - -. --- - - <br /> :� t the deepening of the excavation In order to access.the contaminated soil. <br /> .✓ <br /> ,iae� <br />