Laserfiche WebLink
V <br /> ELROY COX <br /> EMILY COX <br /> PAGE 2 <br /> Further, any remediation test wells needed to conduct feasibility studies for the site should be installed <br /> at the same time as the monitoring wells in order to avoid multiple mobilizations. <br /> Please proceed with the push point scope of work, as proposed in the workplan and with the <br /> modifications noted above, by submitting a completed permit application and the associated <br /> $89.00 fee for each separate parcel to be investigated to this office by December 11, 1995. The <br /> proposed work should be completed by January 15, 1996. <br /> Using the newly generated data, please submit to PHS/EHD by March 11, 1996, an addendum to <br /> the original workplan describing the results of the push point work and proposing the number, <br /> location and construction of any additional wells needed to complete the assessment phase of <br /> this investigation, including feasibility test wells. <br /> Given the massive scope of the groundwater contaminant plume identified at the site, the need for j <br /> further research on the history and past uses at the site is warranted at this time. Please conduct a <br /> more thorough investigation into the history and past usage at the site and on nearby <br /> properties in order to identify additional potential sources to the groundwater contaminant <br /> plume. This information should be included in the workplan addendum. <br /> If you have any questions or wish to discuss this letter in more detail, please contact Linda Turkatte, <br /> Senior REHS, at (209) 468-3441. <br /> Donna Heran, REHS, Director <br /> Environmental Health Division <br /> Linda A. Turkatte, Senior REHS Diane M. Hinson, REHS <br /> Site Mitigation Unit Supervisor } <br /> LT <br /> c: CVRWQCB, Beth Thayer <br /> c: SWRCB Cleanup Fund, Annabel Mackey <br /> c: Jack Vaughn <br /> c: Scott Malm <br /> c: Wright Environmental Services, Lester Messina <br /> ) <br />