Qw Page I of 1 <br /> Mike Infurna [EH] <br /> From: John Lynch [lynch @inreach.com] <br /> Sent: Wednesday, December 10, 2003 2:42 PM <br /> To: Gary Cox; Janice Brown; Dennis Cox <br /> Cc: Jeff Downs; Mike Infurna [EH] <br /> Subject: Cox and Cox Status Report 12-10-03 <br /> Importance: High <br /> We now have all contract documents in place and are working on the schedule and will begin utility <br /> relocation work soon. Jeff Downs and I are working on scheduling the work around and after we obtain <br /> well destruction permits, the weather and other commitments for other clients we are now finishing up <br /> on. <br /> It should come as no surprise that we will not get started until after the 5th of January with digging the <br /> contaminated soil. However, we have completed the subsurface utility location work and can now <br /> proceed with the relocation of the water line by MW-9 in conjunction with collection of our last soil <br /> characterization samples required for disposal work. I will coordinate with Earl on disruption of the <br /> water service to the tenants in order to relocate the service for digging the contaminated soil. <br /> We now know precisely where the 48-inch irrigation is(under the east end of the trailers) and the 24- <br /> inch sewer trunk line for the south side of town (just in front of welding shop). Therefore we will <br /> confine our digging to between those two utilities (a distance of about 14-feet) while allowing certain <br /> utilities (gas service and phone) to span the pit(with support). <br /> A draft schedule will be mailed by next week to each of you and to Mike Infuma at EHD. <br /> A Merry Christmas to all of you. <br /> Thank you for your patience. <br /> John Lynch <br /> Cc Earl Breinstein, Firestone Tire Store <br /> 12/10/2003 <br />