Laserfiche WebLink
Page 2 of 2 <br /> Heinz property. The proposed location is just across the tracks from the site within the fence <br /> area. At either location the soil would be wrapped in plastic and sampled and characterized for <br /> proper disposal. Both locations will satisfy the concern for Tenant exposure and safety and <br /> support access to tenants, fire and life safety by avoiding huge piles of dirt on site. These are the <br /> basics for soil management that I would like to discuss with you and then provide any additional <br /> information you may request. <br /> I can squeeze the water storage tank somewhere at the site (car lot in the front or along RR tracks <br /> behind building) but would prefer putting it across the tracks in a fence in yard away from any <br /> possible derailment. <br /> I suppose after we discuss the above ideas that the final conditions for the work will be provided <br /> by EHD. I look forward to working out the details with you. <br /> I am considering starting the work in early December or January with your approval and once we <br /> finalize minor soil and water management issues. Additionally,the work will start after our <br /> contract is finalized with each of the Cox and Cox Partners. I look forward to hearing from you. <br /> Thank you, John Lynch <br /> 1 <br /> li <br /> 11/12/2003 <br />