My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0010080
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
595
>
3500 - Local Oversight Program
>
PR0544793
>
ARCHIVED REPORTS XR0010080
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:04 AM
Creation date
9/3/2019 1:29:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0010080
RECORD_ID
PR0544793
PE
3528
FACILITY_ID
FA0006237
FACILITY_NAME
HONEST AUTO SALE AND REPAIR
STREET_NUMBER
595
Direction
E
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23337004
CURRENT_STATUS
02
SITE_LOCATION
595 E ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I� <br /> If flowing is severe, then duplicate advances of individual borehole locations may be <br /> required to collect the desired samples at the location, which could sisgruf cantiv increase <br /> drilling time and costs in sampling and borehole sealing <br /> The boreholes will be drilled with truck mounted hollow stem auger and/or direct push <br /> drilling equipment All drilling equipment and sampling tools will be cleaned prior to <br /> arriving, between driving samples and before leaving the site The augers of push rods <br /> will be advanced to the desired sampling depth interval, and a drive split spoon sampler <br /> will be driven ahead of the drill bit The sampler will then be retrieved and dissembled, <br /> and the soil filled brass or acetate liners retained for chemical analysis will be sealed with <br /> Teflon® paper and plastic end caps, labeled, logged onto chain-of-custody forms and <br /> place in a chilled ice chest on crushed ice Drill cuttings will be drummed and left on-site <br /> The boreholes will be logged using the Unified Soil Classification System under the <br /> supervision of a registered geologist Additional litholoaic information may be collected <br /> to describe the subsurface geology Soil samples will be reconnaissance field screened for <br /> presence of contaminants by checking for presence of odor and staining, and use a photo <br /> ionization meter for soil field vapor measurement use Soil samples will be collected at <br /> minimum five-foot intervals, with additional samples collected at intervals of obvious <br /> contamination and at stratigraphic features of interest using field discretion <br /> Upon completion of the borehole drilling and collection of information, all boreholes will <br /> be backfilled with cement grout placed from the bottom to top of the borehole by tremae <br /> line <br /> Reconnaissance Groundwater Sampling <br /> ill boreholes will be sampled using push or drill rods or hollow stem auger as temporary <br /> casing Depth to groundwater measurements will be made to the nearest orae-one <br /> hundredth of one foot from existing grade and also checked for the presence of separate <br /> please product The groundwater sample will be carefully collected with a clean disposable <br /> bailer and poured into the appropriate laboratory prepared container with minimum <br /> cavitations and headspace Each water sample will be labeled, logged onto a chain-of- <br /> custody form, and placed in a chilled ice chest on crushed ice <br /> Geophysical Survey-Potential Contaminant Sources <br /> A surface geophysical survey using ;round-penetrating radar will be used to search for <br /> subsurface anomalies, which could be potential contaminant sources Wright feels that <br /> this is the most efficient method to search for possible source given the buildings and <br /> pavements present, which covers most of the property The survey will cover an area of <br /> about one-quarter acre in area, which include the former tank pit area, the welding <br /> building and the area of MT W-9 and immediate vicinity <br /> i <br /> Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.