Laserfiche WebLink
Souza II LLC -2- SEP 17 2001 <br /> investigative workplan/Corrective Action Plan (CAP)before performing any work. This phasing process <br /> and the workplan/CAP requirements were intended to: <br /> 1. help the responsible party undertake the necessary corrective action in a cost-effective,efficient and <br /> timely manner; <br /> 2. enable the regulatory agency to review and approve the proposed cost-effective corrective action <br /> alternative before any corrective action work was performed; and <br /> 3. ensure the Fund will only reimburse the most cost-effective corrective action alternative required by <br /> the regulatory agency to achieve the minimum cleanup necessary to protect human health,safety and <br /> the environment. <br /> hazard to public health,or the environment. Program regulations allow the responsible party to undertake <br /> interim remedial action after: (1)notifying the regulatory agency of the proposed action,and; (2) <br /> complying with any requirements that the regulatory agency may set. Interim remedial action should only <br /> be proposed when necessary to mitigate an immediate demonstrated hazard.Implementing interim <br /> remedial action does not eliminate the requirement for a CAP and an evaluation of the most cost <br /> effeedve corrective action alternative <br /> Three bids and Cost Preavnroval: Only corrective action costs required by the regulatory agency to <br /> protect human health,safety and the environment can be claimed for reimbursement. You must comply <br /> with all regulatory agency time schedules and requirements and you must obtain three bids for any <br /> required corrective action. Unless waived in writing,you are required to obtain preapproval of costs for <br /> all future corrective action work. If you do not obtain three bids or a waiver of the three bid <br /> requirement,reimbursement is not assured and costs may be rejected as ineligible. <br /> If you have any questions,please contact me at(916)341-5681. <br /> Sincerely, <br /> Sandy Gill <br /> Claims Review Unit <br /> Underground Storage Tank Cleanup Fund <br /> cc. Mr.Gordon Boggs Ms.Margaret Lagorio <br /> RWQCB,Reg. 5 -Sacramento San Joaquin County EHI3 <br /> 3443 Routier Road P.O. Box 2009 <br /> Sacramento,CA 95827-3098 Stockton,CA 95201 <br /> California Effvironmentv1Fm echoBA eacy <br /> ��Rnrir/MAeprr <br />