My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
612
>
3500 - Local Oversight Program
>
PR0544794
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:51 AM
Creation date
9/3/2019 2:09:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544794
PE
3528
FACILITY_ID
FA0013337
FACILITY_NAME
SOUZA II LLC (VACANT LOT)
STREET_NUMBER
612
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23439018
CURRENT_STATUS
02
SITE_LOCATION
612 W ELEVENTH ST
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Souza II LLC -2- SEP 17 2001 <br /> investigative workplan/Corrective Action Plan (CAP)before performing any work. This phasing process <br /> and the workplan/CAP requirements were intended to: <br /> 1. help the responsible party undertake the necessary corrective action in a cost-effective,efficient and <br /> timely manner; <br /> 2. enable the regulatory agency to review and approve the proposed cost-effective corrective action <br /> alternative before any corrective action work was performed; and <br /> 3. ensure the Fund will only reimburse the most cost-effective corrective action alternative required by <br /> the regulatory agency to achieve the minimum cleanup necessary to protect human health,safety and <br /> the environment. <br /> hazard to public health,or the environment. Program regulations allow the responsible party to undertake <br /> interim remedial action after: (1)notifying the regulatory agency of the proposed action,and; (2) <br /> complying with any requirements that the regulatory agency may set. Interim remedial action should only <br /> be proposed when necessary to mitigate an immediate demonstrated hazard.Implementing interim <br /> remedial action does not eliminate the requirement for a CAP and an evaluation of the most cost <br /> effeedve corrective action alternative <br /> Three bids and Cost Preavnroval: Only corrective action costs required by the regulatory agency to <br /> protect human health,safety and the environment can be claimed for reimbursement. You must comply <br /> with all regulatory agency time schedules and requirements and you must obtain three bids for any <br /> required corrective action. Unless waived in writing,you are required to obtain preapproval of costs for <br /> all future corrective action work. If you do not obtain three bids or a waiver of the three bid <br /> requirement,reimbursement is not assured and costs may be rejected as ineligible. <br /> If you have any questions,please contact me at(916)341-5681. <br /> Sincerely, <br /> Sandy Gill <br /> Claims Review Unit <br /> Underground Storage Tank Cleanup Fund <br /> cc. Mr.Gordon Boggs Ms.Margaret Lagorio <br /> RWQCB,Reg. 5 -Sacramento San Joaquin County EHI3 <br /> 3443 Routier Road P.O. Box 2009 <br /> Sacramento,CA 95827-3098 Stockton,CA 95201 <br /> California Effvironmentv1Fm echoBA eacy <br /> ��Rnrir/MAeprr <br />
The URL can be used to link to this page
Your browser does not support the video tag.