My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE CASE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
950
>
2900 - Site Mitigation Program
>
PR0505733
>
SITE INFORMATION AND CORRESPONDENCE CASE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:51 AM
Creation date
9/3/2019 2:30:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
CASE 1
RECORD_ID
PR0505733
PE
2950
FACILITY_ID
FA0006970
FACILITY_NAME
TOSCO #787
STREET_NUMBER
950
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23406002
CURRENT_STATUS
02
SITE_LOCATION
950 W ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WELL DEST. , 05-03-93 <br /> MW1 <br /> CASING = 28 FT LENGTH X 0.022 FT2 = 0.62 FT3 <br /> SAND PACK = (2 3 FT LENGTH X (0 "5 5 FT2 - 0'.022 FT2) ) X 0.3 = <br /> 3 .64 FT3 <br /> TOTAL CEMENT NEEDED: 4.26 FT3 , <br /> MW2 <br /> CASING 28 FT LENGTH X 0.022 FT2 a 0.62 FT3 <br /> SAND PACK (24 FT LENGTH X_ (0.55 FT2 - 0 .022 FT2) ) X 0 .3 = <br /> 3 .8 FT— <br />"f TOTAL CEIdEN'r NEEDED: 4 .42 FT3 <br /> 3 MW3 <br /> CASING 29 FT LENGTH X 0.022 FT2 = 0.64 FT3 <br /> SAND PCR (23 FT LENGTH X_ (0.55 FT2 —0.022 FT2) ) X 0.3 a <br /> 3 . 64 FTA <br /> TOTAL CEMENT NEEDED: 4.28 FT3 <br /> MW4 <br /> CASING 14 FT LENGTH X 0.022 FT2 = 0.31 FT3 <br /> SAND PACK = (8 FT LENGTH X (0.35 FT2 - 0 .022 FT2) ) X 0.3 = <br /> 0 .79 FT3 <br /> TOTAL CEMENT NEEDED: 1.1 FT3 <br /> TIME FRAME <br /> Once we have obtained the closure letter we will permit and <br /> schedule the well -destructions within one week. <br /> page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.