Laserfiche WebLink
WELL DEST. , 05-03-93 <br /> MW1 <br /> CASING = 28 FT LENGTH X 0.022 FT2 = 0.62 FT3 <br /> SAND PACK = (2 3 FT LENGTH X (0 "5 5 FT2 - 0'.022 FT2) ) X 0.3 = <br /> 3 .64 FT3 <br /> TOTAL CEMENT NEEDED: 4.26 FT3 , <br /> MW2 <br /> CASING 28 FT LENGTH X 0.022 FT2 a 0.62 FT3 <br /> SAND PACK (24 FT LENGTH X_ (0.55 FT2 - 0 .022 FT2) ) X 0 .3 = <br /> 3 .8 FT— <br />"f TOTAL CEIdEN'r NEEDED: 4 .42 FT3 <br /> 3 MW3 <br /> CASING 29 FT LENGTH X 0.022 FT2 = 0.64 FT3 <br /> SAND PCR (23 FT LENGTH X_ (0.55 FT2 —0.022 FT2) ) X 0.3 a <br /> 3 . 64 FTA <br /> TOTAL CEMENT NEEDED: 4.28 FT3 <br /> MW4 <br /> CASING 14 FT LENGTH X 0.022 FT2 = 0.31 FT3 <br /> SAND PACK = (8 FT LENGTH X (0.35 FT2 - 0 .022 FT2) ) X 0.3 = <br /> 0 .79 FT3 <br /> TOTAL CEMENT NEEDED: 1.1 FT3 <br /> TIME FRAME <br /> Once we have obtained the closure letter we will permit and <br /> schedule the well -destructions within one week. <br /> page 3 <br />