My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE CASE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
950
>
2900 - Site Mitigation Program
>
PR0505733
>
SITE INFORMATION AND CORRESPONDENCE CASE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:51 AM
Creation date
9/3/2019 2:30:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
CASE 1
RECORD_ID
PR0505733
PE
2950
FACILITY_ID
FA0006970
FACILITY_NAME
TOSCO #787
STREET_NUMBER
950
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23406002
CURRENT_STATUS
02
SITE_LOCATION
950 W ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
l WELL DEST. , 05-03-93 <br /> All wells have machine slotted PVC 0 .02 inch screen. MW1 and MW2 <br /> the screens were installed from the 28 foot depth to the 8 foot <br /> depth, MW3 the screen was installed from the 29 foot depth to the <br /> 9 foot depth and the MW4 screen was installed from the 14 foot <br /> depth to the 9 foot depth. The sand pack in MW1, MW2 and MW3 is <br /> medium aquarium sand and the sand- pack in MW4 is #3 Monterey. <br /> The sand pack was brought up to two feet above the top of screen <br /> in MW1 and MW4 and three feet above the screen in MW2 and MW3 . <br /> Bentonite and cement annular seals are above the sand packs, see <br /> Appendix A. <br /> WELL DESTRUCTIONS <br /> We proposed to pressure grout the 'wells in place : <br /> 1) Connect grout pump tubing to casing. <br /> 2) Pressure grout casing and sand pack with neat cement. <br /> 3) Remove grout pump tubing from casing, let stand one <br /> hour. <br /> 4) If grout has dropped in the casing, add appropriate <br /> grout to fill casing. <br /> 5) Drill out the base of the traffic box into the neat <br /> cement annular seal. <br /> 6) Back fill the traffic box and area drilled out with <br /> concrete flush to surface and finish. <br /> VOLUME OF CEMENT TO FILL CASING AND SAND PACK. <br /> Area of a circle = err? <br /> Volume of casing = height x area of circle. <br /> Volume of sand pack = area of sand pack - area of <br /> casing x height of sand pack x 30% porosity. <br /> Area of 2 inch casing converted to feet = ( (2/2) 2 x 3 . 14) / (12 x <br /> 12) _ <br /> 3 :14/144 = 0 . 022 ft2 <br /> Area of 8 inch boring converted to feet = ( (8/2) 2 x 3 . 14) /144 <br /> 50 . 3/144 = 0 .35 ft2 <br /> Area of 10 inch boring converted to feet = ( (10/2) 2 x 3 . 14) /144 <br /> 78 . 5/144 = 0 .55 ft2 <br /> page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.