Laserfiche WebLink
2-28-1997 10:47AM FROM HORIZON/ELDORADO 916 939 2172 <br /> COST ESTIMATE DETAM <br /> WINNER FORDIDISCOVERY CHEVROLET PROJECT <br /> 1615 West 11th Street <br /> I <br /> Tracy,California <br /> DFSCREMON:As described in propscal dated February 6, 1997 <br /> TASK QTY UNI RATE MARKU COST I <br /> 1.0 Revised Workplan,Permitting,Health&Safety <br /> 1.1 Workplan&SSP <br /> Senior Geologist 1 hours $95.00 $95.00 <br /> Project Manager 2 hours $8.5.00 $170.00 <br /> I'I Staffgeologist - 4 each $58.00 5232.00 <br /> Clerical I each $40.00 $40.00 <br /> subtotal: $537.00 <br /> 1.2 Permitting <br /> Projcct - 1 hours $65.00 $65.00 <br /> ff Permit Fees - I ea $89.00 1.15 $102.35 <br /> subtotal: $167.35 <br /> r TOTAL ESTIMATED COST FOR TASK 1.0: $70435 <br />{ 2.0 Install Monitoring wells Collect Soil and Groundwater Samples <br /> 2.1 Hand Auger Sampling of Soil . <br /> Project Manager 1 hours 585.00 $85.00 . <br /> Tcchnican 10 hours $38.00 $380.00 <br /> PowerAugcr 10 hours $35.00 $350.00 <br /> Vehicle I day $95.00 $85.00 j <br /> PID 1 day $100.00 5100.00 J <br /> Sampling Equipment 1 day $150.00 $150.00 <br /> subtotal: $1,150.00 <br /> 2.2 Drilling and Well Installation <br /> Project Manager 1 hour; $85.00 585.00 <br /> StaffGcologist 8 hours $58.00 $464.00 <br /> -Driller - 50 feet $30.00 1.15 $1,725.00 <br /> i <br /> Drums 2 each $40.00 1.15 $92.00 <br /> vehicle I day $75.00 $75.00 <br /> Equipment(M.Safety,etc,) 1 day $150.00 $150.00 <br /> subtotal: $2,591.00 <br /> 2.3 Laboratory(Soil&Water) <br /> TPHg&STEX 13 each $50.00 1.15 $747.50 <br /> BioParameters(5 wells) 5 each $150.00 1.15 $862:50 <br /> subtotal: $747.50 <br /> 2.4 Miscellaneous Exp <br /> Soil&Water Disposal I ea $600.00 1.15 $690.00 <br /> Surveyor I each $350.00 1.15 $402.50 <br /> subtotal: $1.092.50 <br /> TOTAL ESTIMATED COST FOR TASK 2.0: $5,581.00 <br /> Horizon Environmental Inc. <br /> 3001aSA S <br /> t <br />