Laserfiche WebLink
ROPMs,MAMSYl,KOHN&BE"nRy <br /> Mr. Thomas Nokes <br /> Re: Soil Remediation at Former Discovery Chevrolet Site <br /> December 8, 1995 Page 2 <br /> Environmental, Inc. , onto the Premises for excavation and removal <br /> of soil, backfilling and resurfacing on the weekend of <br /> December 30th and 31st, 1995, so that the Premises are restored <br /> to full business usability prior to opening an Monday, January > <br /> 1996. <br /> We have no way of determining from the limited information <br /> that has been provided to us whether the efforts involved in the <br /> Executive Summary of Workplan, reflected in the letter of <br /> November 15, ' 1995 from Mr. Barker to Ms_ Hinson, will result in a <br /> significant reduction of the environmental problems on the <br /> property. Wg have repeatedly requested that you provide us with <br /> full disclosure of the nature and extent of pollution, as it has <br /> been disclosed to you, and you have refused to so provide. We <br /> again request that you provide us with full information regarding <br /> the extent of environmental impairment of the property and your <br /> specific intentions with regard to efforts to remediate the <br /> property. <br /> As you have been informed, Tracy Chevrolet is moving forward <br /> with its plans to vacate the premises at the earliest <br /> commercially reasonable date, which is anticipated to be in the <br /> Autumn of 1996. This need to vacate the premises is occasioned <br /> by the serious toxic condition of the property, which has not <br /> been remediated and apparently will not be substantially <br /> remediated for quite some time. <br /> You indicate in your letter that the Workplan has been <br /> approved by San Joaquin County and the workplan Summary must be <br /> posted at the Site. will you please provide me with a copy of <br /> the approvedsWorkplan and the statute or ordinance which sets <br /> forth the requirements for posting so that I may adequately <br /> advise my client. <br /> By copy.of this letter to Gary Barker, Senior Project <br /> Manager at Horizon Environmental, Inc. , I request confirmation <br /> that the excavation will be supervised by Mr. Barker or another <br /> Manager from Horizon. Environmental, Inc. and that the entire <br /> SR1\92027.1WR1 <br /> 22iST'd IN83fHW SN3dOd WU9S:TT S.G. 92 33a <br />