My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0010226
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
1615
>
3500 - Local Oversight Program
>
PR0544799
>
ARCHIVED REPORTS XR0010226
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:05 AM
Creation date
9/3/2019 3:28:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0010226
RECORD_ID
PR0544799
PE
3528
FACILITY_ID
FA0003872
FACILITY_NAME
DISCOVERY CHEVROLET
STREET_NUMBER
1615
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23227019
CURRENT_STATUS
02
SITE_LOCATION
1615 W ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Former Discovery Chevrolet June 5, 1998 <br /> Tracy California Corrective Action Plan <br /> is not possible because the well casing is located within two feet of the north bearing wall of <br /> the service bay building. <br /> 6.3 Required Permits <br /> As with any excavation and aboveground onsite treatment, notification of the San Joaquin <br /> Valley Unified Air Pollution Control District (SJVUAPCD) will be necessary for the site <br /> operations. Additionally, an Excavation Permit from the SJC PHSIEHD or SJVUAPCD <br /> may also be necessary. Horizon or the selected excavation contractor will arrange for the <br /> acquisition of the permit(s) from the appropriate agency for the proposed site work. A-W 1 <br /> Destruction Permit will be acquired from the SJC PHS/EHD prior to the proposed water <br /> well destruction work, and if necessary, prior to the excavation of well MW-1. <br /> 6.4 Implementation Schedule <br /> It is Horizon's understanding that the CAP review process allows for public comments and <br /> vs input on the proposed Corrective Action. After completion of the 30-day review period, the <br /> SJC PHSXHD will contact the property owner, Ms. Michelle Nokes, with the results of the <br /> public review process. At that time, Horizon will address any appropriate questions or <br /> comments, then proceed with scheduling of the proposed Corrective Action work. The <br /> projected schedule for implementation of the proposed Corrective Action is during the <br /> summer of 1998. <br /> 6.5 Proposed Verification Monitoring <br /> In their letter dated May 13, 1998, the SJC PHSIEHD states that two quarters of <br /> groundwater sampling should be performed to verify the effectiveness of the remedial work. <br /> It is our understanding that the first groundwater sampling can be performed immediately <br /> after completion of the soil excavation operations, with the second groundwater sampling <br /> occurring approximately one calendar quarter after completion of the soil excavation <br /> operations. <br /> 3001-21.cap 19 HORIZON ENVIRONMENTAL INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.