Laserfiche WebLink
_ ... .... .. .. .. <br /> Third Quarter 1997 Status Report - Former Discovery Chevrolet <br /> r.. October 17, 1997 <br /> Previous Environmental Work <br /> Based on information supplied by Ms. Nokes, we understand that the three USTs were` <br /> removed in April 1993. Four soil samples were collected from the base of the gasoline UST <br /> excavation at depths of approximately 4 to 10 feet below ground surface (bgs), 'one soil <br /> sample was collected from beneath'the.product dispenser at approximately 5.5 feet bgs, and <br /> one soil sample was collected from the base of the waste oil UST excavation at <br /> approximately 7.5 feet bgs. Groundwater was not encountered during UST removal. <br /> Information supplied by SICEHD indicates that the product piping that ran from the gasoline <br /> USTs to the dispenser, located inside the service bays, was left in place beneath the concrete <br /> apron outside the shop building. <br /> Petroleum hydrocarbons were detected in all soil samples collectedduring the UST removal. <br /> Soil samples collected from the' gasoline UST excavation contained Total Petroleum <br /> Hydrocarbons as gasoline (TPHg) at concentrations ranging from 920 to 4,400 part .per <br /> million (ppm). : Benzene was detected in all these soil samples at concentrations ranging from. <br /> 5.9 to 39 ppm. Total lead was detected in two'of these soil samples at concentrations of 19 <br /> and 4.0 ppm. TPHg and benzene were detected in the. soil sample collected beneath the <br /> product dispenser at concentrations of 21 and 0.88. ppm, respectively. TPHg, Total <br /> r=. Petroleum Hydrocarbons as Diesel (TPHd), and,benzene were detected in the soil sample <br /> from the waste oil excavation at concentrations .of 31, 270 and 0.18 ppm, respectively. <br /> Te'trachlororoethene (72 parts per.billion, or ppb), lead (7.8 ppm), and chromium (4.2 ppm). <br /> were also detected in this sample. <br /> Based on results of soil sample analyses `from thea UST removal, GSI performed a <br /> preliminary site assessment to further evaluate hydrocarbons in the soil and to evaluate <br /> Whether hydrocarbons had impacted groundwater beneath. the site. Three on-site <br /> groundwater monitoring wells were installed at the,locations shown on the Site PIan (Figure <br /> 2) in September 1994. One soil sample from-approximately 10 bgs in each soil boring was <br /> submitted for analysis. TPHg were detected in the soil sample from boring MW-1 (340 <br /> ppm) and MW72 (240 ppm). The benzene concentrations in these samples were 3.9 and 2.4 <br /> ppm, respectively. Petroleum hydrocarbons were not detected in the soil sample from boring <br /> MW-3. Groundwater in the newly installed wells was"measured between 9.97 and.10.49 feet <br /> bgs, and appeared to flow north-northeast at a gradient.of 0.003. Floating product was not <br /> observed in the monitoring wells.' TPHg was detected in.the groundwater sample collected <br /> from well MW-1 (640 parts per billion, or ppb) and MW-2 (7,200 ppb). The benzene <br /> concentrations in these samples were 35 and 370 ppb, respectively. Petroleum hydrocarbons <br /> were not detected in the groundwater sample collected from well MW-3. Results of that <br /> investigation were reported in, GSI Report No. 8146.701-1, Preliminary Environmental . <br /> Investigation Report, dated December 7, 1994. Depth-to-groundwater and chemical <br /> analytical data are summarized in Table 1. , <br /> 8146.04-3 2 <br />