My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0007784
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
10948
>
2600 - Land Use Program
>
UP-01-0009
>
SU0007784
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 4:41:11 PM
Creation date
9/4/2019 9:43:56 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0007784
PE
2656
FACILITY_NAME
UP-01-0009
STREET_NUMBER
10948
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WY
City
MANTECA
APN
20402004
ENTERED_DATE
6/22/2009 12:00:00 AM
SITE_LOCATION
10948 S AIRPORT WY
RECEIVED_DATE
6/22/2009 12:00:00 AM
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\A\AIRPORT\10948\UP-01-09\SU0002162\APPL.PDF \MIGRATIONS\A\AIRPORT\10948\UP-01-09\SU0002162\CDD OK.PDF \MIGRATIONS\A\AIRPORT\10948\UP-01-09\SU0002162\EH COND.PDF \MIGRATIONS\A\AIRPORT\10948\UP-01-09\SU0002162\EH PERM.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
315
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> s • - <br /> ' p <br /> SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION � L DISTRICT <br /> , <br /> Compliance Assistance Bull%in- Decem%;UNTROber, 1994 <br /> Asbestos Synopsis <br /> Asbestos Qemohu6n:i .nov'Mor.n Sufi r�uuy <br /> f ° Prior to any EingmAlign of 42=111:20—n of a facility <br /> f y In_sipect: Conduct an asbestos inspection of the site before <br /> ■ Any renovation in which 160 sq.ft. of building materials, or 260 linear feet of pipe insulation will be disturbed, or <br /> e Any demolition of a facility with or without asbestos-containing materials <br /> r <br /> Notify: Submit an asbestos notification form for any regulated renovation or demolition, 10 working days before the activity. <br /> Fees: Fees must be paid to the District with the notification for all regulated renovations and demolitions. <br /> Demolition Release Form: Prior to any demolition, you must have completed a demolition release form. Upon its approval by the <br /> District this signed form may be used as proof (needed by the building official) of compliance with, or exemption from, the <br /> NESHAP notification requirements. L <br /> Submit this form to the building department with your apptication for a demolition permit. <br /> , <br /> Applicability <br /> Facilities subject to the NESHAP (regulated facilities) include all commercial buildings, apartments with more than 4 units, other f <br /> structures and non-portable equipment. Single family dwellings may be exempt, but only on a case by case basis. <br /> I]emolRtians subject to the NESHAP(regulated demolitions)are demolitions of facilities described above, whether or not asbestos <br /> is present. <br /> Regulated renovation applies to any activity in which 160 sq. ft. of regulated asbestos-containing building materials or 260 linear <br /> feet of asbestos-containing pipe insulation is disturbed at a regulated facility. <br /> II. <br /> Aslo-estos tatf�caUrtd #rlspcon Regements I'. <br /> <....... <br /> I <br /> Definitions: I <br /> Facilities' Facilities subject to the rule include "ail structures, installations, buildings and equipment, <br /> except for single family dwellings and apartments with four or fewer dwelling units." <br /> Single family dwellings and apartments are also subject to the regulation if.- <br /> it <br /> f:e There is more than one building at a site being renovated or demolished, or , <br /> ■The building had been used for, or is being removed for a commercial or public use, or <br /> is to be used as a training burn exercise, <br /> Demolition: In addition to the total destruction of a structure, demolitions include "the removal of any <br /> structural' load-bearing member from a facility together with any related handling <br /> operations or the intentional burning of a building` (training burns conducted by a fire <br /> fighting agency). Also: the separation of a structure from its foundation prior to <br /> relocation is a demolition. <br /> i <br /> Renovation: Altering a facility or one or more facility components in any way, including the stripping <br /> or removal of regulated asbestos-containing material (RACM) from a facility component. <br /> Renovations include all activities in which asbestos could be disturbed at a regulated <br /> facility,including the clean up and removal of debris from buildings which have burned. <br />' I <br /> r r I <br /> , <br /> JM h:lcegajoaMasbstosl,syn <br />
The URL can be used to link to this page
Your browser does not support the video tag.