Laserfiche WebLink
SAN JOAOUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT <br /> Compliance Assistance Bulletin- December, 1994 <br /> Asbestos Synopsis <br /> Definitions Continued <br /> Vgularals R CM!InContaining (1) Friable asbastos-containing material (ACM). <br /> (2) Category 1 nonfriable ACM in poor condition and "has become friable" or that has or <br /> will be subjected to sanding, grinding, cutting, or abrading. <br /> (3) Category It nonfriable ACM that has a high probability of becoming, or as become, <br /> crumbled, pulverized, or reduced to powder by the forces expected to act on the <br /> material in the course of demolition or renovation. <br /> containing more than 1 percent asbestos, as determined by Polarized Light <br /> Friable Asbestos-Containing Any material costa g <br /> Microscopy (PLM) testing, which, when dry, can be crumbled, pulverized, or reduced to <br /> Materia!(A CMP <br /> powder by hand pressure. <br /> Any asbestos-containing packings, gaskets, resilient floor coverings, and asphalt roofing <br /> Category!nonfriable ACM: <br /> products containing more than 1 percent asbestos as determined by PLM testing. <br /> Category 11 nonfriable ACM: Any asbestos containing materials, excluding Category 1 ACM, containing more than 1 <br /> percent asbestos as determined by PLM testing, which when dry, cannot be crumbled. <br /> pulverized, or reduced to powder by hand pressure. <br /> f ' <br /> krspecrian:done by, or under the direction of a Cal-OSHA certified consultant prior to: <br /> • Any regulated demolition. <br /> • Any renovation activity in which more than 160 sq.ft. of any building material or 260 linear feet of pipe insulation will be <br /> disturbed. An inspection is not required if the material to be disturbed is stipulated to be asbestos-containing and will be .� <br /> removed in accordance with the NESHAP. <br /> f <br /> Inspection Report Must Include: <br /> •A schematic showing the location of all tested materials. <br /> The following data for all asbestos-containing materials. <br /> E 1.The amount and description of each material. <br /> 2. Percent asbestos content. <br /> i 3.Whether or not the material is friable. <br /> Notification: An asbestos notification must be submitted to the District at least 10 working days prior to: <br /> 1. Any regulated demolition <br /> 2. Any renovation in which more than 160 sq.ft.or 260 linear ft. of RACM will be disturbed. <br /> i A copy of the Asbestos Inspection Report must be included with fhe Notification. <br /> Notification will not be considered compiete, nor will the 10 working day notice period begin unti! al; required information and <br /> fees and fees have been submitted to the District. <br /> Fees: District Aule 3050 requires that nonrefundable asbestos fees be received along with asbestos job notifications. Fees must <br /> be paid for regulated asbestos abatement projects and regulated demolition projects, whether or not asbestos is present. <br /> I. Demolition Release Form: The California Health and Safety Code requires that the city or county building official have proof of <br /> compliance with, or exemption from, the asbestos notification requirement before he or she issues a demolition permit. <br /> After the District has received a demolition notification and is satisfied that the NESHAP notification requirements have been <br /> complied with, the District will issue a Demolition Release Form to the person who submitted the notification. <br /> RecVclina and Waste Disposal. The asbestos notification must also identify any building materials which will be recycled after <br /> removal from a project. The name of the recycling contractor and location of such activity must be identified. <br /> For additional information, please contact the Compliance Division of your nearest regional office: <br /> Northern Region Central Region Southern Region <br /> 4230 Kieman Avenue, Suite 130 1990 East Gettysburg Ave. 2700 M Street, Suite 275 <br /> Modesto CA 95356.9321 Fresno CA 93725 Bakersfield CA 93301-2374 <br /> (209)557.6400 (559)230-5950 (661)326-6900 <br /> JM h:lcegajoanlasbstosl.syn <br />