Laserfiche WebLink
i <br /> r <br /> Ms. Jolley indicated that when tltc revised Site Plan is submitted, the project will be re-referred <br /> out. <br /> Mr. Borges reviewed the Environmental Health Division requirements. <br /> Mr. Darrow indicated that he wanted to include to the memo the design criteria of the table 4.1. <br /> from the Uniform Plumbing Code. <br /> Mr.Neely reviewed the Department of Public Works requirements. <br /> 10:00 2. A MAJOR SUBDIVISION APPLICATION NO. SU-00-1 OF ERNEST E. & <br /> JJ IRENE PESTANA CIO LIVERMORE ACRES AND BAUMBACH& <br /> PIAZZA. A Major Subdivision application to create a 307 residential lot <br /> subdivision with a vesting tentative map, (Lockeford Oaks). (APN: 019-060-29; <br /> Address: 13751 E. Brandt Road,Lodi). <br /> Jennifer Jolley,Associate Planner;John Tague and Ed Pestana,Livermore Acres, Inc.; Mike <br /> Hakeem, attorney;Josh Elson and Terry Piazza,Baumbach&Piazza,were present for this item. <br /> Ms. Jolley introduced the project. <br /> Mr.Hakeem and Ms.Jolley discussed different options for mitigating for the loss of agricultural <br /> land. <br /> Mr. Piazza asked if Mr.Neely would have the language changed on the Department of Public <br /> Works memo item#17 to read: turnarounds will be required when determined by the Department <br /> of Public Works. Mr.Neely indicated that he would have the language changed. <br /> Mr. Hakeem and the Committee discussed the Department of Public Works condition#20 a. <br /> regarding traffic intersection mitigation fees. <br /> Mr. Hakeem asked Mr.Neely if they could provide target dates on the phasing. <br /> Mr. Piazza questioned the Department of Public Works condition#22 regarding the minimum <br /> elevation of 94 feet NGVD-29. Mr.Neely suggest that Mr.Piazza speak with Mr. Callahan of <br /> Flood Control regarding this issue. <br /> Mr.Piazza questioned the Air Pollution Control District requirements. He said he did not think <br /> they should be included as conditions of approval.Ms.Jolley indicated that she would look into <br /> the issue again. <br /> Ms. Jolley handed out a letter of opposition to the applicants. <br /> The meeting was adjourned at 10:40 a.m. <br /> THE DEVELOPMENT COMMITTEE VAN BUREN <br /> AIRMAN <br /> C: Ben Hulse,Director <br /> Jon Moore, Chief Deputy Director <br />