My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012711
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
4800
>
2600 - Land Use Program
>
TA-00-09
>
SU0012711
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2019 3:46:33 PM
Creation date
9/4/2019 9:46:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0012711
PE
2685
FACILITY_NAME
TA-00-09
STREET_NUMBER
4800
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
APN
17726005
ENTERED_DATE
12/23/2019 12:00:00 AM
SITE_LOCATION
4800 S AIRPORT WAY
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\A\AIRPORT\4800\TA-00-09\SPEC PP.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STocKTON METROPOLTFAN AIRPORT SPEaAL PURPOSE PLAN -AIR METRO PARK ADDENDUM <br /> RECOMMENDED CIRCULATION IMPROVEMENTS <br /> The Air Metro Park addendum to Stockton <br /> Metropolitan Airport Special Purpose Plan recom- <br /> mends the following circulation improvements for <br /> the area: <br /> Northrup Street <br /> Northrup Street is currently an unpaved gravel road <br /> passing between a collection of poor quality build- <br /> ings. <br /> In order to realize this corridor's potential for new <br /> infill and redevelopment, it is recommended that <br /> Northrup Street be rebuilt and improved with <br /> street curbs, street paving, and all necessary utility <br /> and drainage facilities. <br /> Lockheed Street <br /> Lockheed Street currently dead-ends just south of <br /> C.E. Dixon Street (at the intersection with <br /> Northrup Street). <br /> In order to allow full build-out of the major unde- <br /> veloped portion of Air Metro Park(the area extend- <br /> ing between Boeing and Northrup Streets),it is rec- <br /> ommended that Lockheed Street be extended <br /> south and connected to Longe Street. The extend- <br /> ed section of Lockheed Street should be construct- <br /> ed with street curbs,street paving,and all necessary <br /> utility and drainage facilities. <br /> New Internal Street <br /> A recommended, but optional street improvement <br /> is a new internal street that would be constructed <br /> between the Lockheed Street extension and <br /> Boeing/Stimson Street. This envisioned new inter- <br /> nal street would allow for an improved circulation <br /> flow for vehicles wishing to connect to Airport Way <br /> via Boeing/Stimson Street. <br /> 4-4 CIRCULATION <br />
The URL can be used to link to this page
Your browser does not support the video tag.