Laserfiche WebLink
STOCKI'ON METROPOLITAN AIRPORT-SP1L PURPOSE PLAN° INTRODUCTION <br /> County of San Joaquin Process <br /> 6a 7 8 <br /> Stockton <br /> Metropolitan Proposals Conforming to <br /> Airport Design Special Purpose Plan Submit for Submit Responses <br /> Review Committee Building to Comments for <br /> (SMADRC) ICA eat Is Approved Permit Final Building <br /> and Agency Application Permit Review/ <br /> Design Review 6b 6C Review Issuance <br /> Review Timr:2S Days Review Time:14 Dans Rerie•Time:W Gays <br /> �- Proposals not Conforming <br /> K 1 to Special Purpose Plan Appeal to Appeal to <br /> Planning County <br /> Commission Board of <br /> Supervisors <br /> If Appeal Is Approved <br /> R"k.Time:M+Dans ReviewTime30r Da."s <br /> 6d <br /> Apply for <br /> Amendment o Speial CEOA Process <br /> ,..y Purpose Plan <br /> �r Review Time:W,pars <br /> • Orient the project to utilize the natural assets Step 3: Incorporate the Design Guidelines <br /> of the site and environment. and Development Standards into the design <br /> • Integrate the project into the public solution. <br /> streetscape. <br /> • Project the appropriate public image toward Develop submission products clearly showing <br /> F the street and adjacent parcels. incorporation of the Design Guidelines and <br /> Provide a long-range evolutionary strategy for Development Standards. <br /> phased growth and expansion. <br /> Approval Process <br /> ,51 Step.2: Refine the relationship to the The Special Purpose Plan Design Guidelines and <br /> Special Purpose Plan goals and objectives Development Standards are designed to expedite <br /> throughout the design process. the approval process for development submissions <br /> that are substantially consistent with approved <br /> • Conceptual Design Phase: establish relation- guidelines and standards. The application is a site <br /> ships with overall site conditions;goals and improvement plan for a commercial building per- <br /> objectives. mit which is a ministerial application. The diagram <br /> • Schematic Design Phase: consider design above highlights the steps in this process. <br /> trade-offs between competing objectives and <br /> propose solutions. <br /> • Design Development Phase: incorporate solu- Step 4: Prepare Application Using Checklist <br /> tions into the project that support the goals <br /> and objectives. The approval process begins with the applicant <br /> preparing an application for a site improvement <br /> THE PLAN/APPROACH &PROCESS 1. 2-5 <br /> F i <br />