My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012711
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
4800
>
2600 - Land Use Program
>
TA-00-09
>
SU0012711
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2019 3:46:33 PM
Creation date
9/4/2019 9:46:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0012711
PE
2685
FACILITY_NAME
TA-00-09
STREET_NUMBER
4800
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
APN
17726005
ENTERED_DATE
12/23/2019 12:00:00 AM
SITE_LOCATION
4800 S AIRPORT WAY
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\A\AIRPORT\4800\TA-00-09\SPEC PP.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INTRODUCTION STOCKTON MET-PouTAN AIRPORT -SPECIAL PURPOSF PLAN : <br /> plan using the County of San Joaquin's checklist. Step 7) If the written comments identify issues <br /> This checklist,found in Appendix A, identifies the that warrant further discussion,the CDD will con- <br /> minimum submission requirements in terms of vene the SMADRC to meet with the applicant and <br /> drawings and support documentation. Additional resolve the issues. At the time of Design Review <br /> documentation indicating how the project is con- Approval,staff will also provide an estimate of the <br /> sistent with the goals and objectives of the Special fees pertaining to the project. Building permit fees 0 <br /> Purpose Plan may accompany the submission. will be calculated at the time of building permit <br /> application. <br /> Step 5: Submit Application to the 0 <br /> Community Development Department Applications approved by the SMADRC must be <br /> found to be substantially consistent with the Ea <br /> The applicant will then submit the project to the Special Purpose Plan Design Guidelines and 13 <br /> County of San Joaquin Community Development Development Standards. An application may be <br /> Department (CDD).The CDD provides for. a sin- found to be consistent although it does not strict- E3 <br /> gle coordinated process for the Site Plan and ly comply with each and every single guideline, <br /> Architectural Approval of projects and building provided the goals and objectives of the Special Ea <br /> plans that generally result in the issuance of a Purpose Plan are achieved. <br /> Building Permit. <br /> Inevitably,the determination with respect to an E3 <br /> Within 7 days,the CDD will review the applica- application that does not adhere strictly to all of <br /> tion for completeness. If the application is incom- the guidelines will involve judgement as to the E3 <br /> plete,the items for completion will be identified general consistency of the application. In cases 13 <br /> and the applicant will be notified. Complete appli- where the application differs,the applicant is <br /> cations will be referred to the Stockton advised to provide additional information explain- 13 <br /> Metropolitan Airport Design Review Committee ing how the project achieves the goals and objec- <br /> (SMADRC). tives of the Special Purpose Pian. E3 <br /> Step 6a: Design Reviews Steps 6b,6c, 6d: Options for Non- E3 <br /> Conforming Proposals: <br /> The SMADRC is comprised of representatives of 13 <br /> the Airport Manager,County Administrator, If it appears that significant inconsistencies are E3 <br /> Environmental Health Division, Department of present between the application and the Special <br /> Public Works,and the Building Division. Within 28 Purpose Plan,or other approving agency codes or E3 <br /> days,the SMADRC will initiate and complete a regulations,the CDD will deny the application and <br /> Design Review of the application for compliance inform the applicant in writing of the specific <br /> with the Special Purpose Plan and applicable inconsistencies.The applicant then has three E3 <br /> codes,as well as architectural and environmental options; a) correct the inconsistencies and resub- <br /> reviews. In addition,the Airport Manager will mit the application to the CDD; b) apply for an 13 <br /> refer the application to the Federal Aviation amendment to the Special Purpose Plan; or c) <br /> Administration for their review and comment. appeal the denial to the Planning Commission. If <br /> the Planning Commission finds the application is <br /> Once a proposal has been reviewed,written com- consistent with the Special Purpose Plan and <br /> ments from the reviewing agencies will be for- grants approval, the submission will be returned E3 <br /> warded to the CDD within 2 weeks of receiving to the streamlined process. If the appeal is denied, <br /> the referral. If the comments verify that the appli- the applicant will have the opportunity to appeal <br /> 13 <br /> cation is consistent with the Special Purpose Plan, to the County Board of Supervisors. If the Board E3 <br /> and all approving agency codes and regulations,the approves the appeal,the applicant may submit a <br /> applicant may apply for a building permit. (See building permit application. 0 <br /> L 2-6 THE PLAN 1 APPROACH & PROCESS 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.