My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012711
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
4800
>
2600 - Land Use Program
>
TA-00-09
>
SU0012711
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2019 3:46:33 PM
Creation date
9/4/2019 9:46:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0012711
PE
2685
FACILITY_NAME
TA-00-09
STREET_NUMBER
4800
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
APN
17726005
ENTERED_DATE
12/23/2019 12:00:00 AM
SITE_LOCATION
4800 S AIRPORT WAY
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\A\AIRPORT\4800\TA-00-09\SPEC PP.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT WIDE GUIDELINES AND STANDARDS STOCKTON METROPOLITAN AIRPORT -SPECIAL PURPOSE PLAN <br /> E3�y Q <br /> E3 <br /> r i x # ; • <br /> r •� •x x <br /> Y <br /> • E3 <br /> i <br /> Identity Markers 13 <br /> E3 <br /> E3 <br /> PROJECT IDENTITY/ <br /> ORIENTATION MARKERS 13 <br /> Goals: 13 <br /> These markers will help to establish a clearly rec- Q <br /> • To produce a marker for Stockton ognizable architectural and landscape image for <br /> Metropolitan Airport which identifies Stockton Airport,and will reinforce the urban 0 <br /> the site's formal entrances while com- design framework of the project. The Markers will <br /> plementing the Airport's history,iden- incorporate light features to increase night time ca <br /> tity,and purpose. visibility and should include integral project signage E3 <br /> elements to assist visitor and resident orientation. <br /> • Orient monument into the landscape 0 <br /> for maximum visibility along vehicular Guidelines: <br /> corridor. E3 <br /> I. The elements should be architectural in <br /> • Incorporate sculpture as feature at the nature,establish a formal identity to the <br /> tap, project and project a consistent theme for 13 <br /> the site. <br /> Orientation Markers are located within the land- 13 <br /> scaped gateways to the Stockton Metropolitan 2. The markers are to be incorporated into 0 <br /> Airport site to identify project entries,to orient the landscape flanking primary intersections. <br /> motorists,pedestrians, and cyclists,and to provide 13 <br /> a cohesive and consistent system of project identi- <br /> fication elements. 13 <br /> C3 <br /> E3 <br /> III. 4-22 OPEN SPACE, LANDSCAPE AND STREETSCAPES <br /> C3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.