Laserfiche WebLink
SPECIFIC LAND USE GUIDELINES AND S STOCKFON ME,7M7POLITAN AIRPORT- SPECIAL PURPOSE PLAN <br /> Domestic Water <br /> Domestic water for the airport terminal area and alignments of the water distribution lines are gen- <br /> the Air Metro Industrial Park is supplied by two eralized and exact locations of the lines will be <br /> wells that are tied into the City of Stockton water determined when individual Improvement Plans <br /> system�Bath the Farmington Fresh air cargo facili are submitted. <br /> t`y_" the egional sports complex southeast of <br /> the main runwaY aye served b-inde p endent�wells. Domestic water demand for the Airport East <br /> � y <br /> development area has been calculated for the uses <br /> Development west of the main runway will contin- proposed in the land use plan in Figure I-A. Design <br /> ue receiving domestic water from the City of criteria used to calculate the demand was taken <br /> Stockton under the Southern Water System from the 1985 South Stockton Master Water Plan <br /> Operation & Maintenance Agreement between the Table 3-1 and San Joaquin County Standards & 15 <br /> City of Stockton and the County of San Joaquin. Specifications.The ultimate system design should <br /> provide fora minimum of 40 psi at any location 19 <br /> The Airport Property is within the City of for the peak hour demand and a minimum of 20 <br /> Stockton water service area in accordance with psi at any location during the Maximum Day <br /> the adopted 1985 South Stockton Master Water demand combined with a fire flow of 2500 gpm 15 <br /> Plan by Leedshill - Herkenhoff. Under this Master out of any fire hydrant.The domestic water <br /> Plan domestic water for the Airport East develop- demand is summarized in Table V-1. 15 <br /> ment area will be provided by the City of <br /> Stockton.The proposed domestic water master For detailed system calculations please refer to IS <br /> plan for the Airport East area identifies the addi- A.R.Sanguinetti &Associates' Domestic Water <br /> tional facilities planned to distribute water service Master Plan,dated January 2000. 19 <br /> to commercial, industrial and open space uses Is <br /> throughout the development area.Water lines <br /> would be extended to each parcel through a net- Is <br /> worked piping system. The source of water for <br /> the Airport East development area will come from 13 <br /> the proposed 1ainchwater main along A7h-' <br /> AirportaRaod andaw well: Pipe sizes for the <br /> distribution system range from 8 to 16 inches.The <br /> IS <br /> Is <br /> 15 <br /> 0 <br /> V. 1-2 INFRASTRUCTURE <br />