Laserfiche WebLink
k LSA ASSOCIATES,INC. INITIAL STUDY/ENVIRONMENTAL DOCUMENTATION <br /> JULY2000 STOCKTON METROPOLSrAN AIRPORT <br /> SPECIAL.PURPOSE PLAN <br /> f) For a project within the vicinity of a private airstrip,would the project result in <br /> a safety hazard for people residing or working in the project area? <br /> No impact. The proposed project involves a public airport and is subject to strict <br /> regulations imposed by the Federal Aviation Administration and Caltrans' Division <br /> of Aeronautics. <br /> I g) Impair implementation of or physically interfere with <br /> an adopted emergency <br /> response plan or emergency evacuation plan? <br /> FLess than significant impact. No change from what was addressed previously in the <br /> Airport Master Plan EIR. With implementation of the SPP, an increase in fire <br /> r <br /> protection services will be needed. Because the Montezuma Fire District is funded <br /> by a per-square-foot per building levy, emergency services will be adequately <br /> provided. <br /> f h) Expose people or structures to a significant risk of loss,injury or death <br /> involving wildland fires,including where wildlands are adjacent to urbanized <br /> areas or where residences are intermixed with wildlands? <br /> No impact. The proposed project is not located in an area that is subject to wildland <br /> fire hazards. The SPP will not expose people or structures to an increased risk of <br /> wildland fires. <br /> VIII. Hydrology and Water Quality: <br /> F: Would the project: <br /> a) Violate any water quality standards or waste discharge requirements? <br /> No impact. The proposed project is not expected to violate any water quality <br /> standards or waste discharge requirements. The potential for increased discharges of <br /> pollutants that could exceed the Regional Water Quality Control Board water quality <br /> objectives would be small because NPDES stormwater permit requirements exist for <br /> any applicable industrial facility that would locate in the developed Airport East <br /> property for the Air Metro Industrial Park. <br /> Airport Master Plan Mitigation: <br /> Mitigation Measure DW-3: Obtain and implement NPDES permits for general <br /> F construction activity and implement erosion control plan specified in the County <br /> grading permit. <br /> b) Substantially deplete groundwater supplies or interfere substantially with <br /> groundwater recharge such that there would be a net deficit in aquifer volume <br /> or a lowering of the local groundwater table level(e.g.,the production rate of <br /> pre-existing nearby wells would drop to a level which would not support <br /> F existing land uses or planned uses for which permits have been granted)? <br /> No impact. The proposed project is not expected to affect groundwater supplies or <br /> FF adversely contribute to groundwater overdraft. Water supply will be provided as <br /> outlined in the SPF Water Master Plan, which is consistent with the City of <br /> Stockton's Water Master Plan. <br /> 7120100(P:1SJC0301Environmentallinitial study.wpd) <br /> F 36 <br />