My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012766
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
5000
>
2600 - Land Use Program
>
EIR-96-1
>
SU0012766
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/2/2020 3:04:32 PM
Creation date
9/4/2019 9:46:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0012766
PE
2677
FACILITY_NAME
EIR-96-1
STREET_NUMBER
5000
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206-
APN
17726012
ENTERED_DATE
1/2/2020 12:00:00 AM
SITE_LOCATION
5000 S AIRPORT WAY
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\A\AIRPORT\5000\EIR-96-01\PUB REC REL APPL.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C <br /> Criteria for Determining the Significance of Impacts . . . . . . . . . . . . . . . . . . . 6-13 <br /> VEGETATION IMPACT ASSESSMENT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-14 <br /> Impact VW-1: Loss of 2.65 Acres of Freshwater Marsh . . . . . . . . . . . . . . . . 6-14 <br /> Impact VW-2: Loss of 0.6 Acre of Drainage Ditch . . . . . . . . . . . . . . . . . . . . 6-15 <br /> Impact VW-3: Loss of 1.2 Acres of Seasonal Pool Habitat . . . . . . . . . . . . . . 6-15 <br /> Impact VW-4: Conversion of Approximately 591 Acres of Agricultural <br /> Fields and Potential Habitat for Special-Status Plant Species <br /> to Developed Areas . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-16 <br /> Impact VW-5: Potential Loss of Oak Trees . . . . . . . . . . . . . . . . . . . . . . . . . . 6-16 <br /> WILDLIFE IMPACT ASSESSMENT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-17 <br /> Impact VW-6: Loss of Habitat for Common Wildlife Species . . . . . . . . . . . . 6-17 <br /> Impact VW-7: Direct Mortality and Loss of Habitat for Vernal Pool <br /> Fairy Shrimp and Vernal Pool Tadpole Shrimp . . . . . . . . . . . . . . . . . 6-17 <br /> Impact VW-8: Potential Loss of Giant Garter Snake Habitat . . . . . . . . . . . . . 6-18 <br /> ` Impact VW-9: Potential Loss of Swainson's Hawk Foraging Habitat . . . . . . 6-18 <br /> # Impact VW-10: .Potential Disturbance of Nesting Swainson's Hawks . . . . . . 6-19 <br /> Impact VW-11: Potential Loss of Burrowing Owl Nesting and <br /> Foraging Habitat . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-20 <br /> Impact VW-12: Loss of or Disturbance to an Active Raptor Nest . . . . . . . . . 6-21 <br /> Impact VW-13: Loss of Suitable Foraging Habitat for Other Special-Status <br /> Species . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-21 <br /> Consistency with General Plan and Other Planning Policies . . . . . . . . . . . . . 6-22 <br /> Chapter 7. Transportation and Circulation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-1 <br /> SETTING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-1 <br /> Regulatory Setting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-1 <br /> Environmental Setting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-2 <br /> IMPACTS AND MITIGATION MEASURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-4 <br /> Approach and Methodology . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-4 <br /> Criteria for Determining Significance of Environmental Impacts . . . . . . . . . . . 7-6 <br /> 2015 PROPOSED PROJECT WITH PHASE 1 INTERCHANGE <br /> IMPROVEMENTS . . . . . . . . . . . . . • . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-7 <br /> Impact T-1: Increased Traffic at Roadways, Freeway Ramps, <br /> and Intersections Resulting from Project (Phase 1 Interchange) <br /> Conditions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-8 <br /> 2015 PROPOSED PROJECT WITH PHASE 2 INTERCHANGE <br /> IMPROVEMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-8 <br /> Impact T-2: Increased Traffic at Roadways, Freeway Ramps, <br /> and Intersections Resulting from Project(Phase 2 Interchange) <br /> Conditions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-9 <br /> Consistency with General Plan and Other Planning Policies . . . . . . . . . . . . . . 7-9 <br /> Chapter 8. Air Quality . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . I . . . . . . . . . . . 1 . 8-1 <br /> SETTING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-1 <br /> Regulatory Setting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-1 <br /> Environmental Setting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-4 <br /> iii <br />
The URL can be used to link to this page
Your browser does not support the video tag.