My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012766
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
5000
>
2600 - Land Use Program
>
EIR-96-1
>
SU0012766
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/2/2020 3:04:32 PM
Creation date
9/4/2019 9:46:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0012766
PE
2677
FACILITY_NAME
EIR-96-1
STREET_NUMBER
5000
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206-
APN
17726012
ENTERED_DATE
1/2/2020 12:00:00 AM
SITE_LOCATION
5000 S AIRPORT WAY
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\A\AIRPORT\5000\EIR-96-01\PUB REC REL APPL.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IMPACTS AND MITIGATION MEASURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-5 <br /> Impact Assessment Methods and Key Assumptions . . . . . . . . . . . . . . . . . . . . . 8-5 <br /> Criteria for Determining the Significance of Impacts . . . . . . . . . . . . . . . . . . . . 8-8 <br /> 2015 PROPOSED PROJECT WITH PHASE 1 OR PHASE 2 INTERCHANGE <br /> IMPROVEMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-8 <br /> Impact AQ-1: Temporary Emissions of ROG and <br /> NO, Resulting from Construction Activities . . . . . . . . . . . . . . . . . . . . . 8-8 <br /> Impact AQ-2: Temporary Emissions of PMIO from Construction Activities . 8-9 <br /> 2015 PROPOSED PROJECT WITH PHASE 1 INTERCHANGE <br /> IMPROVEMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-10 <br /> Impact AQ-3: Exceedance of Carbon Monoxide Standards Under 2015 <br /> Project(Phase 1 Interchange) Conditions . . . . . . . . . . . . . . . . . . . . . . 8-10 <br /> Impact AQ-4: Increased Ozone Precursor and PM 10 Emissions Under <br /> 2015 Project (Phase 1 Interchange) Conditions . . . . . . . . . . . . . . . . . . 8-11 <br /> 2015 PROPOSED PROJECT WITH PHASE 2 INTERCHANGE <br /> IMPROVEMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-12 <br /> i Impact AQ-5: Exceedance of Carbon Monoxide Standards Under <br /> N 2015 Project (Phase 2 Interchange) Conditions . . . . . . . . . . . . . . . . . . 842 <br /> Impact AQ-6: Increased Ozone Precursor and PM 10 Emissions Under <br /> 2015 Project (Phase 2 Interchange) Conditions . . . . . . . . . . . . . . . . . . 8-12 <br /> Consistency with General Plan and Other Planning Policies . . . . . . . . . . . . . 8-13 <br /> Impact AQ-7: Inconsistency with General Plan Policies . . . . . . . . . . . . . . . . 8-13 <br /> 1 Chapter 9. Noise . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-1 <br /> SETTING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-1 <br /> Regulatory Setting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-1 <br /> Environmental Setting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-2 <br /> IMPACTS AND MITIGATION MEASURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-3 <br /> Impact Assessment Methods and Key Assumptions . . . . . . 9-3 <br /> [ Criteria for Determining the Significance of Impacts . . . . . . . . . . . . . . . . . . . . 9-4 <br /> 2015 PROPOSED PROJECT WITH PHASE 1 OR PHASE 2 <br /> INTERCHANGE IMPROVEMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-5 <br /> - Impact N-1: Exposure of Noise-Sensitive Uses to Noise From Construction <br /> Activities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-5 <br /> Impact N-2: Exposure of Noise-Sensitive Land Uses to Increased <br /> Aircraft Noise . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-6 <br /> 2015 PROPOSED PROJECT WITH PHASE 1 INTERCHANGE <br /> IMPROVEMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-6 <br /> Impact N-3: Exposure of Noise-Sensitive Land Uses to Increased Surface <br /> Traffic Noise Under 2015 Proposed Project(Phase 1 Interchange) <br /> Conditions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-7 <br /> 2015 PROPOSED PROJECT WITH PHASE 2 INTERCHANGE <br /> IMPROVEMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-7 <br /> Impact N-4: Exposure of Noise-Sensitive Land Uses to Increased Surface <br /> Traffic Noise Under 2015 Proposed Project (Phase 2 Interchange) <br /> Conditions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-7 <br /> iv <br />
The URL can be used to link to this page
Your browser does not support the video tag.