<br /> Stockton Metropolitan Airport Table No. 12-1
<br /> 5-Year Development Program
<br /> Engineer's Estimate
<br /> ng:
<br /> P.rolect Construction Inspect on& Total Local F A A
<br /> N4 Descnpfioq Cost: Admintstratan Cast Particjpation Fart�cipatton.
<br /> 13 Reconstruct General Aviation Apron - 350,400 Sq. Ft. $900,000 $198,000 $1,098,000 $109,800 $988,200
<br /> 14 250 KVA Emergency Generator and Upgrade Switchgear 240,000 53,000 293,000 29,300 263,700
<br /> 15 Disabled Passenger Lift 50,000 11,000 61,000 6,100 54,900
<br /> 16 Handicap Elevator - Airline Terminal Building 220,000 48,400 268,400 26,840 241,560
<br /> 17 Construct Taxiways D, D2, D4, D7 and D9 6,500,000 1,430,000 7,930,000 793,000 7,137,000
<br /> 18 Reconstruct and Widen Lindbergh Street 470,000 103,400 573,400 57,340 5I6,060
<br /> TOTAL PROJECT COSTS $19,181,000 $4,219,960 $23,400,960 $2,340,096 $21,060,864