Laserfiche WebLink
<; TABLE NO. 12-1 <br /> STOCKTON METROPOLITAN AIRPORT <br /> 5-YEAR DEVELOPMENT PROGRAM - ENGINEER'S ESTIMATE <br /> g <br /> n►g, <br /> Poject [nsp cU <br /> r <br /> Construction on& Total Local F A A <br /> l3esctlpttcsr� Cyst: Admxn�sirataon Cast patt�c�pAt�on I'attictpattpz <br /> 1 Construct Extended Safety Area - Runway 29R- <br /> 150' x 1,000' $1,500,000 $330,000 $1,830,000 $183,000 $1,647,000 <br /> 2 Construct Runway 29R East End Blast Wall 320,000 70,400 390,400 39,040 351,360 <br /> "3 Construct Runway I IL West End Blast Wall 320,000 70,400 390,400 39,040 351,360 <br /> 4 Relocate Localizer Antenna 200,000 44,000 244,000 24,400 219,600 <br /> 5a Overlay and Groove Runway I IL-29R - 150' x 8,600' 1,830,000 402,600 2,232,600 223,260 2,009,340 <br /> 5b Rehabilitate Shoulder- Runway 11L-29R - 35' x 4,200' 250,000 55,000 305,000 30,500 274,500 <br /> 5c Install Runway Centerline and Touchdown Zone Lights <br /> Runway IIL-29R 650,000 143,000 793,000 79,300 713,700 <br /> 5d Replace Runway Edge Lighting System - Runway 11L-29R 270,000 59,400 329,400 32,940 296,460 <br /> 5e Replace Airfield Guidance Signs 163,000 35,860 198,860 19,886 178,974 <br /> 6 Overlay Taxiway B - Taxiway F to Runway 29R Threshold <br /> (75' x 2,950') 683,000 150,000 833,000 83,300 749,700 <br /> '7 Reconstruct Taxiway B Shoulders 290,000 64,000 354,000 35,400 318,600 <br /> 8 Relocate MALS Electrical Building 50,000 11,000 61,000 6,100 54,900 <br /> 9 Webers Slough Mitigation - Construct North Side Drainage 1,000,000 220,000 1,220,000 122,000 1,098,000 <br /> 110 Construct Taxiway D - Runway 29R to End Runway 29R <br /> Extension - 150' x 1,100' 1,200,000 264,000 1,464,000 146,400 1,317,600 <br /> 11 Reconstruct Taxiway H- 75' x 1,000' 1 575,000 126,500 701,500 70,150 631,350 <br /> 12 Extend Air Cargo Apron - 300' x 700' 1,500,000 330,000 1,830,000 183,000 1,647,000 <br />