Laserfiche WebLink
March 6, 1996 <br /> John Carlson <br /> Page -2- <br /> NOTICE OF PREPARATION OF THE EIR FOR THE STOCKTON METROPOLITAN <br /> AIRPORT <br /> With respect to water service, the water system must conform to the City's most current <br /> South Stockton Water System Master Plan. At present, an update to the current plan is <br /> being initiated which wiII also reflect the projected needs of this project. It is anticipated <br /> t that as a minimum, the study will recommend at least one new well site in the project <br /> area, capable of producing approximately 2000 gpm. It is also anticipated, however, <br /> that due to the increased water demand resulting from this project, and the adverse <br /> ` environmental impacts as described in Item Lb, that the construction of the South <br /> Stockton Aqueduct will be necessary to provide adequate water service to this project. <br /> Please include these comments with any others that may be provided by our other Departments. <br /> Thank you for providing us the opportunity to review this document, and if you have any <br /> questions, please contact Mark Madison at ext. 8782. <br /> . : MORRIS L. ALLEN <br /> DIRECTOR OF MUNICIPAL UTILITIES <br /> MLA:-MJM:mm <br /> cc: Don Dodge. Assistant Director of INfunicipal Utilities/EM <br /> Ed Formosa. Deputy Director of Municipal Utilities/Water and Collections Systems <br /> y <br /> I <br /> I` <br />