Laserfiche WebLink
Kerry Sullivan <br /> COMMUNITY DEVELOPMENT <br /> PA-03-537 (IP) <br /> 2. The Water Supply Facilities Impact Mitigation Fee shall be required for this development. The <br /> fee is due and payable prior to issuance of the building permit. (The fee currently is $212.00 per <br /> 1,000 gross square foot of building designated as Warehouse. The fee shall be automatically <br /> increased on January l of each year through the year 2005 at the rate of 7.66 percent. A credit <br /> may be allowed if it can be verified that the existing development on this site was in operation on <br /> or after April 30, 1991.) <br /> (Development Title Section 9-818.4 and Resolutions R-91-327, R-94-185 and R-97-5) <br /> 3. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 4. Verification shall be obtained from the Solid Waste Division (468-3066) that this development <br /> has met the requirements of the Waste Plan Format for Development Projects. Final Site Plan is <br /> required upon submittal of verification. <br /> 5. All new structures or substantial improvements shall be elevated a minimum of two (2) feet. <br /> above the highest grade adjacent to the structure. <br /> NOTE: Any construction activity that results in the disturbance of at least one (1) acre of soil shall <br /> require a State NPDES construction permit. <br />` DTP:SH:ar <br /> E <br /> E P:T0MMENTSU\PA-03-537.wpd <br /> k <br /> F <br />