January.3, 2006 <br /> E NOA Project Number: E05164A <br /> 6.3 Boring Preparation and Presaturation <br /> The soil borings on Parcels 1 and 2 were advanced on the Site with a four inch diameter hand auger <br /> on December 13, 2005. <br /> A 1.5-inch diameter PVC pipe with perforations on the bottom was used to measure the drop of <br /> water in the percolation test boring. Approximately 2 inches of"pea gravel" were placed in the <br /> bottom of the open soil boring,-then the PVC pipe was installed on top of the gravel. "Pea gravel" <br /> 4_ was backfilled in the annular space. <br /> Presaturation of the percolation test holes occurred on December 13, 2005. The depth of water <br />� used to pre-soak was 12 inches above the bottom of the boring. <br /> 6.4 Condition of Borings After Presaturation <br /> After the 24-hour soak period, the presaturated holes were found to be intact and dry on December <br /> 14,2005. <br /> 6.5 Percolation Test Procedure <br /> Percolation tests were conducted for the borings on December 14, 2005 in accordance with the <br /> Fjrequirements of the EHD. A percolation test with a duration of one hour was performed for the <br /> north parcel. A percolation test with a duration of four hours was performed for the boring on the <br /> south parcel. The entirety of the one-hour percolation test and the last half hour of the four hour <br /> percolation test was observed by Mr.Ted Tasiopoulos, Registered Environmental Health Inspector, <br /> EHD t <br /> z. <br /> Measurement of the water level during the.percolation test was from a fixed reference point on the <br /> I PVC casing using an electric well sounder with an depth accuracy of 1/100th foot. All tabulated <br /> values on the field datasheet (appendix) are in decimal feet. After water drop was observed, the <br /> f holes were checked for refill. The refill level was approximately 0.5 ft (6 inches) of water above the <br /> bottom level of the percolation test hole. The readings were taken approximately every 10 minutes <br /> .for a period of one hour for the one hour test, and readings were taken approximately every half <br /> hour for the four hour percolation test. <br /> I` 6.6 Percolation Test Forms and Results <br /> The completed percolation test farms are included in the appendix of this report. <br /> A shallow percolation test is defined by the EHD as being between 36 and 42 inches in depth;a <br /> satisfactory percolation rate for a shallow test is less than or equal to 60 minutes per inch drop One <br /> j percolation test must demonstrate a satisfactory percolation rate within the proposed septic system <br /> rldisposal field of each parcel to utilize a standard septic system. Details of the percolation tests are <br /> 8 <br /> ri . <br />