Laserfiche WebLink
i <br /> COMMENTS ON DEVELOPMENTS <br /> SIJ--91-9 <br /> 9 . Street lighting shall be provided for the subdivision and <br /> 1 along the frontage of Harrison Street. <br /> (Planning Title Section 9-9.301 ) <br /> 10 . The Property shall annex to the Linden Street Lighting <br /> District prior to approval of the Final Map to provide for <br /> the operation and maintenance of street lighting . <br /> ( Planning Title Section 9- 10005 ) <br /> 11 . A County Service Area shall be formed prick to the acceptance <br /> of the Final Mag to provide for the operation maintenance and <br /> improvement of the Storm Drain System. <br /> (Planning Title Section 9- 10004 ) <br /> 12 . A Preliminary Soils Report is required in accordance with the <br /> f County Standards for the purpose of determining the R-Value <br /> for the design of the roads . (Planning Title Section 9-9104 ) <br /> 13 . The subdivider shall agree to and shall pay service fees for <br /> the County provided utilityservices in an amount equal to <br /> the estimated fees for the period from the time the <br /> improvements are accepted until effective date of assessment <br /> on the tax roll . Deposit of fees shall be submitted at the <br /> time of acceptance of the facilities by the County . <br /> ( Subdivision Map Act section 66493 ) <br /> 14 . .All utilities shall be underground except power transmission <br /> facilities of 35 HV or greater . Public easements ;hall be <br /> providedalong the . goad frontage of the subdivision and as <br /> t required by the public utility companies . <br /> f (Planning Title Section 9-9390 ) <br /> i <br /> s onfortr, to the Manual oto <br /> I5 . All traffic signs and markings shall <br /> I <br /> Uniform Traffic Control Devices and San Joaquin County <br /> Standards , and shall be shown on the improvement plans . <br /> ( Planning Title Section 9-9301 ) <br /> H <br /> 16 . The Traffic Impact Mitigation Fee will be requited when <br /> parcels developed . The fee is due and payable at the time of <br /> building permit application. ( The fee currently in ;2 , 096 .00 <br /> ' per single family dwelling unit in the Linden area . The fee <br /> shall be automatically adjusted July 1 of each year by the <br /> ' <br /> Engineering Construction Cost Inde: as published by the <br /> Engineering News Record . ) (Resolution R-90-304 ) <br /> i <br />