Laserfiche WebLink
King and Vanzetti <br /> Revised Conditions of Approval <br /> Page 2 <br /> Avenue shall be constructed in conformance with the <br /> standards for one-half of a 50-foot right-of-way local <br /> residential street. The construction of the frontage <br /> improvements will be deferred upon execution by the owner <br /> of a Deferred Frontage and Roadway Improvement Agreement <br /> or a Secured Deferred Frontage and Roadway Improvement <br /> Agreement with a deposit equivalent to their estimated <br /> construction costs prior to approval of the Parcel Map. <br /> (A $250 . 00 fee currently is required for processing per <br /> Development Title Table 9-240 . 2 in addition to a copy of <br /> the Grant Deed, legal descriptions of Parcels 1, 2 , 3 , & <br /> 4 and an estimate for the required frontage improvements. <br /> The estimate and legal descriptions shall be prepared by <br /> a Registered Civil Engineer with a typical section <br /> drawing on a form to be supplied by the Public Works <br /> Department and submitted to the Public Works Department <br /> for approval. As an option the Department of Public <br /> Works will prepare the drawing and estimate for an <br /> additional fee of $100. 00. ) (Development tile Section 9- <br /> 110. 3) <br /> A!! imprevements shall be in eenfer-manee with the <br /> San j A11 imprevement plans and st)-ee�ieatien <br /> must ef San Jeaquin Department <br /> +h-)-(q) The City of Stockton shall verify that the <br /> appropriate Right of Service Units (R.O.S.U. ) for <br /> sanitary sewer have been paid for the proposed <br /> subdivision prior to approval of the Parcel Map. <br /> (New sewer laterals shall be required when parcels <br /> 1, 2 , & 3 are developed. Approvals for sewer hook- <br /> up from City of Stockton and County will be <br /> required prior to issuance of building permit. ) <br /> (Development Title Section 9-110 . 3) <br /> +i+lh) The subdivider shall initiate processing of <br /> "Segregation of Services" . (A $250. 00 plus $15 . 00 <br /> per lot" fee currently is required for processing <br /> per Development Title Table 9-240. 2) (Development <br /> Title Section 9-110. 3) <br /> � W Requirements for construction of new sewer laterals <br /> shall be noticed by a statement on the Parcel Map. <br /> (Subdivision Map Act Section 66411. 1) <br /> +k+(! ) A ,will Serve" letter from California water Service <br />