Laserfiche WebLink
f <br /> } WNbIT10NS OP APPROVAL <br /> PA x600307 <br /> 4. <br />. City of Tracy <br /> J i <br /> Use; Permit PA <br /> 0600307 _ <br /> .. r <br /> was approved. by the San Joaquin ­y; Planning <br /> Commission on September 21? 2006. The effectnre date of approval �s October`1, 2006 This. <br /> approval will expire on April 1,2008,which 1s 98 months from the effective date of approval, uriles"s <br /> (7)all Conditions of Approyai have been complied wi#h,(2)aII necessary builslirig permits have been <br /> secured and remain in' force, and.(3) ail necessary;perriiits from other..agencies have been secured <br /> and remain in force: z <br /> Unless otherwise specified, all Conditions of.Approval and>Ordinance requirements shall lie fulfilled <br /> prior to the establishment of the use and.tlie issuance of an buifdrn ermits <br /> Y 9-tp Those Conditions <br /> followed by a Section Number have been identified as bedinance'requirements' pertinent:to this <br /> application. Ordinance requirements cannot be-modifiei and:other Ordinance requirements may <br /> i <br /> apply. <br /> 1. COMMUNITY DE=VELOPMENT DEPARTMENT(Staff Contact: Rick Griffin, 1209)46873154) <br /> a. BUILDING PERMIT: Submit an" 'APPLICATION-GRADING BUILDING PERMIT'.. The Site Plan <br /> required as a part of the grading building permit must .show drainage, driveway access details <br /> including gates, on-site parking, landscaping, signs, existing and proposed utility services, and <br /> grading (refer to the "SITE PLAN CHECK LIST' for details). A-fee is required for the Site Plan <br /> review. <br /> b. APPROVED USE: This approval is for the recycling and storage of concrete, dirt, and asphalt into <br /> roadbase material as shown on the Site Plan dated May 25, 2006. <br /> c. CAPITAL FACILITY FEE:f.This project may be subject to the Capital Facility Fee. If the Capital <br /> Facility Fee is applicable, the County shall collect the fees before the issuance of any building <br /> permits_ (Development Title Section 9-1245.2) <br /> d. BUSINESS ,LICENSE: The applicant shall secure an approved Business License prior, to the <br /> initiation of the use. (Section 7-1000 of the County Ordinance Code) <br /> i <br /> e. STORM DRAINAGE: Any additional storm water drainage created by new improvements shall be <br /> retained on-site. The drainage pattern and corresponding storm drain improvements shall be shown <br /> on the Site Plan. Drainage calculations prepared by a registered civil engineer or architect shall be <br /> included. (Development Title Section 9-1135) <br /> f. PARKING: Off-street parking shall,be provided and comply with the following: <br /> (1) All parking spaces, driveways, and maneuvering areas shall be surfaced and permanently <br /> maintained with base material of appropriate depth and asphalt concrete or Portland cement <br /> concrete to provide a durable, dust free surface. Bumper guards shall be provided when <br /> necessary to protect adjacent structures or properties. (Development Title Section 9- <br /> 1015.5[e)) ; <br /> (2) A minimum of three(3)parking spaces shall be provided, including one accessible space, which <br /> shall be van accessible. Accessible spaces shall be located as close as possible to the primary <br /> entrance(C.C.R., Title 24). (spaces determined by Development Title Section.9-1015-9) <br /> i <br /> Conditions of Approval - 1 - PA-0600307 <br /> i <br />