Laserfiche WebLink
2. Mitigation Implementation and Monitoring Program Arch-Sperry Specific Road Pian <br /> Responsible Findings/ Approving ' <br /> Approving Timing My Mitigation Measures Product/ Significance Staff/ <br /> Agency <br /> City Staff Y Body +�.;:':: =:4,;:; Action After Completion <br /> Mitigation Date <br /> TRANSPORTATION AND CIRCULATION <br /> Impact: Unacceptable levels of traffic con estion could occur it the'sho-t term if road construction Is not pr02erly hased. <br /> SCC and City Council Ongoing TC-1. Maintain cceot`b I .` . The City of Stockton and San Monitor roadway 1, NS <br /> SJCBS and Board of through Joaquin'County;shall,;ensure that road construction occurs prior to or and intersection <br /> Supervisors project concurrently,with;,,surrounding area development so that a level of Levels of Rationale: <br /> service of "D",,or;„,better,Es maintained on the roadwayand at Its Service; <br /> DtvIR pages <br /> completion intersections with "surface..streets, �. <br /> Implement road 35-42 <br /> 7? improvements in <br /> a timely fashion <br /> AIR QUALITY <br /> Impact: Proiect construction activities could cause short-term air gUAHN impacts. <br /> SPW and Directors Throughout AQ-1. i ` ` `y <br /> 9 The City of Stockton Field monitoring 1, NS <br /> SJCPW project and San Joaquin,County shall ensure that construction-related dust during active <br /> construction emissions are In Compliance with pertinent regulations. Measures that phBSes of Rationale: <br /> may be implemented to.achieve compliance Include the following: construction DEIR pages <br /> • All exposed"'soil'surfaces:shall be watered in the morning and 43-49 <br /> evening,and whenever dusty conditions are present. <br /> • Truck covers shall be used during the transport of soil, debris and <br /> fill materials: t r a i. ;; <br /> • Ground:coveOshalPbe'�established on inactive portions of the <br /> construction site'ttirough seeding and watering. <br /> • Soil disturb ing�and°'transport activities shall be ceased during <br /> periods of hlgh'�rnrEnds'{greater than 20 mph average over one <br /> hour) wheri�thetatSove rrieastires are not sufficient to suppress , <br /> dust emissions:o' d��,, ,: <br /> Tires'of truck's'Ieaving the construction site shall be washed. <br /> Streets'adjaeerif-t6'9rltie project site that are used by construction <br /> equipment and;;velilcles,shall be swept at least once per day <br /> during construction"to prevent entrainment of soil onto paved <br /> surfaces.• <br /> ReddingCA <br /> .. <br /> 25 <br /> _A+I. <br />