My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012779
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
ARCH
>
0
>
2600 - Land Use Program
>
PA-02-375
>
SU0012779
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2020 4:14:31 PM
Creation date
9/4/2019 9:55:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0012779
PE
2637
FACILITY_NAME
PA-02-375
STREET_NUMBER
0
STREET_NAME
ARCH
STREET_TYPE
RD
City
STOCKTON
ENTERED_DATE
1/3/2020 12:00:00 AM
SITE_LOCATION
0 ARCH RD
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\A\ARCH\0\PA-02-375\CDD OK.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Mitigation Implementation and Monitoring-.Pirogra' Arch-Sperry Specific Road Plan <br /> Approving Responsible Findings/ Approving " <br /> City Staff or Timing Mitigation Measures Product/ Significance Staffl <br /> Agency Body Action After Completlon <br /> Mitigation Date <br /> SPW and Directors Throughout AQ-2. Minimize ConslructjQ„n-Egglpmenl Emissions. The City of Stockton Field monitoring 1, NS <br /> SJCPW project and San .Joaquin County shall require that the road construction during active <br /> construction contractors reduce,Intathal.combustion engine emissions. Measures phases of ` Rationale:-. <br /> that may bd:lmplemented to reduce emissions Include the following: construction DEIR pages <br /> • If,;nedessary;F.'phase.;construction to limit use of motorized 43-49• <br /> equipment and.ensure:,that construction-related emissions do not <br /> exceed.10•loris per year of i`eactive organic gases and/or olCides of <br /> nitrogen.,,,,:. Gri�;,4... ,� ,,•cr;: i: ,:. <br /> • Properly tune and,maintain all construction equipment. <br /> • Schedule all.co'n'struction-related deliveries and goods movement <br /> for off-peals hours so as not to contribute to disruptions In,traffic <br /> flout >- , _..,fi.sz,�Y,l:• .._:, , . ` <br /> • Use low-sulfurduels for co,.,nstruction equipment. d <br /> • Encourage the-use of alternative fuels In construction equipment. <br /> • Limit idling of j construction;equipment and trucks to no longer than <br /> 10 minutes " c- :,} ;•i•,;.g <br /> • L-ocate constructlon parkinareasta minimize traffic interference. <br /> • Minimize obstruction of t>lrough-traffic lanes. <br /> • Use a flag.,person.to properly guide track traffic. <br /> • Provide'adequate.;ingress and.egress at work sites and staging <br /> areas-to minlmlie'vehicle Idling: <br /> Impact: Traffic on the pro osed Arterial could cause exceedance.off slate and federal carbon monoxide standards. <br /> SCDD Directors prior to The'signilicance'iof 7mbon;monoxide concentrations and need for Subsequent 3, PS <br /> and approval of mitigation;wilfitie'datermined.in conlunction with final design of each initial Studies or <br /> SJCPW subsequent phase ol',the: p4qct.! Jf.,.warranted, mitigation measures will be E1Rs Rationale: <br /> environmental lncorporslad,�Wn errWmnmental:,documents addressing subsequent pEIR pages <br /> documents phases.of the p►ialect:''',•r;; ;:",; - . <br /> 43-49 <br /> < InNIPi/Aiy <br /> 7� Redding,QA. <br /> b <br /> 26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.