Laserfiche WebLink
2. Mitigation Implementation and Monitoring. Program Arch-Sperry Specific Road Plan <br /> �9 p .�.; <br /> Findings/ Approving <br /> Responsible Product/ Significance Staff/ <br /> Approving City Staff or Timing `' Mitigation Measures Action After Completion <br /> Agency Bed ;: t;�..►.: , , „ , ., <br /> y �i„• s i W'... , F . . `s Mitigation Date <br /> SHRD Director Prior to LU-5. ur v 11�` li V-'0,Reptk6ment h ust . No person shall be Relocation 1, NS <br /> initiation of forced to move.from a dwelling unless comparable decent, safe and Assistance/ <br /> each phase of sanitary replaoement housing.is available to that person. Compensation Rationale: <br /> ' ' ' Plans DEIR pages <br /> _ construction k ;� - <br /> involving $ k � `, , 60-67 y <br /> displacement <br /> of residents/ <br /> businesses <br /> Impact: Creation of the pro osed ri ht-of-waY could render certain parcels or portions of parcels inaccessible or unusable. <br /> LU-1. See above,,., n� <br /> 1,NS <br /> SPW and Directors Prior to LU-6. (mq lire Un sablePaPrior to'construction of each. Land acquisition <br /> SJCPW initiation of segment of roadwaq..the Clty of.Stockton and/or San Joaquin County Rationale: <br /> each phase of shall acg6treFall''portions'1of parcels that would be left without DEIR pages <br /> construction reasonable_accessw,or_rv6uld. otherwise be rendered essentially 60-67 <br /> unusable because of road construction. <br /> Impact: Drainage and li hting systems constructed in con'unction with the proposed-arterial could adversely affect o erations of the Stockton Munici al Airport. <br /> i'• <br /> SMA, SPW Director Prior to LU-7. Drainage 5vs1em`Desitin.`',The.stormwater drainage system for the Approved 1, NS <br /> and approval of road shall be-designedSto'preclude ponding of water and subsequent drainage plans <br /> SJCPW improvement attracti06V wateifdW'..to`areas where birds could create a hazard for Rationale: <br /> -­ , ,. <br /> plans aircraft operallonsy. Plens.s:for,the drainago system shall be reviewed PIR pages <br /> by Stockton".Metiopfliitan,Alrport`staff to ensure that air safety Is not 60-67 <br /> jeopardized. ul <br /> .�. <br /> Prior to <br /> SMA, SPW Director initiation of LU-8. Light Standard I')etiigh: The City of Stockton and San Joaquin County Approved 1, NS <br /> and each phase of shall ensure-that-the:height of the light standards complies with lighting plans <br /> SJCPW construction Federal Aviation:`Administration (FAA) requirements (FAR Part 77). Rationale: <br /> affecting the Depending on theheight'of the.standards and their proximity to the DEIR pages <br /> airport runway,a Notice`6i Proposed Construction or Alteration(Form 7460-1) 60-67 <br /> approach/ may need to be submitted to the FAA. <br /> departure <br /> path <br /> ENPI" <br /> f.+-` 30 <br />