My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012779
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
ARCH
>
0
>
2600 - Land Use Program
>
PA-02-375
>
SU0012779
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2020 4:14:31 PM
Creation date
9/4/2019 9:55:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0012779
PE
2637
FACILITY_NAME
PA-02-375
STREET_NUMBER
0
STREET_NAME
ARCH
STREET_TYPE
RD
City
STOCKTON
ENTERED_DATE
1/3/2020 12:00:00 AM
SITE_LOCATION
0 ARCH RD
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\A\ARCH\0\PA-02-375\CDD OK.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Mitigation Implementation and Monitoring Program Arch-Sperry Specific Road Plan <br /> Responsible a;r r. Findings/ Approving <br /> Approving Product/ Significance Staff/ <br /> CIty.Staftor Timing �;.:a.'?f Mitl ationMeasures <br /> Agency Body ;: :,ri,: >..:,,..' 9 Action After Completion <br /> Mltl ation Date <br /> BIOLOGICAL RESOURCES <br /> Impact: Proiect construction would result in the loss of riparian habitat and valley oak woodland. <br /> Not Not Not applicable BR-1.Measure BR-1, as presented In the Draft Program EIR is no longer Not applicable 1. NS, <br /> applicable applicable necessary because,it.has,been superseded by adoption of the San <br /> Joaquin CountyVild-Specles Habitat Conservation and Open,Space Rationale;, <br /> Plan(SJMSCP):. The proposed project is consistent with the SJMSCP, FEIR pages <br /> as amended,,as'rellected!n.the conditions of project approval for this 17-1$ }t <br /> proposal. 'Pursuant�to the F1nal EIR/EIS for the SJMSCP, dated <br /> November 15, 2000, and certified by the San Joaquin Council of <br /> Governments oh December 7,2000,Implementation of the SJMSCP Is <br /> expected to reduceiinpacts to blological resources resulting from the <br /> proposed project to.a level of less-than significant. <br /> SCDD and Directors Prior t0 BR-2. A_v_Qld/Mitigate'Tree Removat.. Removal or damage of native trees Tree protection 1, PS <br /> SJCPW initiation of shall be avoided wherever feasible. Mitigation for the loss of native measures in <br /> each phase of trees shall tie undertaksn In,accordance with the more stringent of the subsequent Rationale: <br /> construction following threestandards{regardless of whether the trees are on lands Initial Studies or DEIR pages <br /> under Iurisdictlon of the City of„Stockton or San Joaquin County): a) EIRs 6t3-61 <br /> criteria presented intihe;most current version of the City of Stockton's <br /> Heritage Tree Ordlnance°orslmilar standards in effect at that time, b) <br /> criteria presented in thee.most. current version of the San Joaquin <br /> County Development "Title, 'or c) criteria adopted as part of <br /> environmental review documents for each phase of construction. <br /> Impact: pro act construction may In ure native trees lanned for long-term retentlon, leading to promature death of the trees. <br /> ti <br /> Not Not Not applicable BR-3. Measure 8R-3.,as'),5Msented1n_the Draft Program EIR is no longer Not applicable 1, NS <br /> applicable applicable necessary because,iNha"s tieeri'superseded by adoption of the San <br /> Joaquin County Multi-Specles Habitat Conservation and Open Space Rationale: <br /> Plan (SJMSCP) ' <br /> .`_•:L a proposed project is consistent with the FEIR pages <br /> SJMSCP, as'amended,,:as ,reflected in the conditions of project 17-18 <br /> approval for this p#osil s `Pursuant to the Final EIR/EIS for the <br /> SJMSCP, dated November 15,2000, and certified by the San Joaquin <br /> Council of Govemments on December 7, 2000, Implementation of the <br /> SJMSCP Is expected to reduce Impacts to biological resources <br /> resultln from the ed ro act to a level ofless-than-s! nlficent. <br /> Redding,CA <br />
The URL can be used to link to this page
Your browser does not support the video tag.