Laserfiche WebLink
2. Mitigation implementation and Monitoring-Program: Arch-Sperry Specific Road Plan <br /> Responsible '` Findings/ Approving <br /> Approving City Staff or Timing Mitigation Measures Product/ Significance Staf/ <br /> Agency Body Action After Completion <br /> Miti ation Date <br /> Impact: Project implement tion may adversely affect s eoial-statusplant and wildlife species. <br /> Not Not Not applicable BA-4. Measure BR4, as presented In the Draft Program E!R is no longer Not applicable 1, NS <br /> applicable applicable necessary because-lt has been superseded by adoption of the San <br /> Joaquin County Multi-Species Habitat Conservation and Open Space Rationale: <br /> Plan (SJMSCP). ;. The proposed project Is consistent with the FEIR pages <br /> SJMSCP,-as am`e`nded,' as reflected In the conditions of project 17-1$ <br /> approval for this,proposal. ' Pursuant to the Final EIA/EIS for the <br /> SJMSCP, dated'November'15,2000, and certified by the San Joaquin t <br /> Council of Goveminenis�on December 7, 2000, Implementation.of the <br /> SJMSCP is expected to,Creduce Impacts to biological resources <br /> resulting from.the-'proposed project to a level of less-than-significant <br /> However, any'incldental-take:,of covered species within wetlands or <br /> other Waters',of the:-United'States or resulting from other covered <br /> activities that,'may tequlyd a'Federal permit or authorization, requires <br /> appropriate authodzatlorf-fiord the Cores of Engineers and any other <br /> federal agency,Mth'jurlsdictior. <br /> Impact: Pro ect construction ma adversel affect nesting ml rato birds. - <br /> Not Not Not applicable BR-5. Measure 817-5,—as`'presented In the Draft Program EIR Is no longer Not applicable 1, NS <br /> applicable applicable necessary,becauseilt,has:been superseded by adoption of the San <br /> Joaquin Coiirityy Multi-Specles..Habliat Conservation and Open Space Rationale: <br /> Plan (SJMSCP)., "'7)) project is consistent with the FOR pages <br /> SJMSCP, .:as; amended,,.asr Elected In the conditions of project 17-18 a. <br /> appmval.for t1Ns:proposal.,E Pursuant to the Final EIR/EIS for the <br /> SJMSCP, dated November.->15;2000, and certified by the San Joaquin <br /> Council of Goveinments:on December 7, 2000, implementation of the <br /> SJMSCP=1s''expected ;to 1,reduce Impacts to biological resources <br /> resulting from_.the proposed`project to a level of less-than-significant. <br /> t• ENPLAN <br />