Laserfiche WebLink
2. Mitigation Implementation and Monitor!ng Program Arch-Sperry Specific Road Plan ` <br /> Responsible Findings/ Approving <br /> Approving Prade�ct/ Significance Staff/ <br /> Agency city Staff or Timing Mitigation Measures <br /> g y Body Action After Completion <br /> Mitigation Date <br /> Impact: Road construction would result in disturbance of an asbestos,waste disposal site. <br /> SPW and Directors Prior to HM-2.Asbg5tgs-Wa3te Management Pian. Prior to initiation of surface- SJCEHD and/or 1, NS <br /> SJCPW approval of disturbing activities on the J-M Manufacturing site, a plan for dealing <br /> ' with asbestos-containing.wastes shall be prepared In conjunction with State DTSC <br /> subsequent approval Rationale: <br /> environmental the Environmental Health Department of San Joaquin County Public pages <br /> documents for Health Services andlor.the California Department of Toxic Substances DEIR DEIR " <br /> each ease of Control. The plan shall.characterize the depth and degree of asbestos 82-96 <br /> P contaminatlon and:'present measures to ensure that exposure to <br /> the project asbestos will not obcur.as a result of road construction. Types of <br /> affecting the mitigation to be'consldered in the plan include: <br /> asbestos Establishing a.zero-dust-emisslon protocol to prevent asbestos <br /> waste site particles from becoming airbome. <br /> • Formulating a.disposal plan for all asbestos-containing materials <br /> exposed.duringsconstructlon. <br /> * Specifying appropriate safety procedures for people working in or <br /> near the asbestos disposal site. <br /> CULTURAL RESOURCES <br /> Impact: Project construction could result in disturbance of ldentlfled`archaeolo''tcally significant areas. <br /> SPW and Directors Prior to CR-1. Cultural Resources J.nveMigatlon/Mitii anon. Controlled, systematic Cultural 1, PS <br /> SJCPW initiation of Investigatiori; of,,the -four':archaeologically sensitive areas shall be Resources <br /> each phase of performed,p-d- r to thetlnitiatloniof project construction. A backhoe <br /> P should.be.used.to,excavate,trenches from the outside of the,site area Investigation Rationale: <br /> construction Inward to determine If significant cultural material exists. The Report DEIR pages <br /> affecting the � 97-101 � <br /> sensitive sites excavations��shailWbei,monitored by a qualified archaeologist and <br /> observed by'ai lative%Athodcan,representative. '1l cultural materials <br /> are encountered,'approprlate mitigation measures shall be prescribed <br /> by the archaeologist and Implemented by the project proponent. <br /> r• <br /> R1 <br /> Redding,GA <br />