Laserfiche WebLink
2. Mitigation Implementation and Monitoring Program Arch-Sperry Specific Road Plan <br /> Responsible Findings/ <br /> gs/ Approving " <br /> Agency City Staff or Timing Mitigation Measures Product/ Significance staff/ <br /> Body Action After Completion <br /> Mitigation Date <br /> Impact: Pro'ect construction could result in disturbance of previously,unidentified cultural materials, possibly includinq human remains. <br /> SPW and Directors Throughout CR-2. Subsurfoe CU41! teri Is. If subsurface cultural materials are Construction 1' OS <br /> SJCPW construction encountered.,elsewhere-during project construction, all construction monitoring <br /> activities in those'areas'shall be hatted until a qualified archaeologist reports Rationale: <br /> can examine the materials;make a determination of their significance, DEIR'pages <br /> and recommendAmplement mitigation measures as appropriate. <br /> 97-101 <br /> SPW and Directors Throughout CR-3. kiln the'event of discovery of human remains, Construction 1, PS <br /> SJCPW construction however fragmentary;or dfsturbed,'the San Joaquin County Coroner, monitoring <br /> the City of Stockton Community Development Department and the reports Rationale: <br /> Native American Indian Commission shall immediately be notified,, <br /> DES pages <br /> < ); u <br /> 97-101 <br /> Im <br /> j - <br /> 1 ! t <br /> 35 Redding,CA <br />