Laserfiche WebLink
xv) Adequate sanitary facilities shall be provided for the multi-recreational building, per the <br /> requirements of Chapter 4 of the California Plumbing Code. <br /> xvi)This project will be required to comply with the Model Water Efficient Landscape <br /> Ordinance requirements of the California Code of Regulations,title 22,Division 2,Chapter <br /> 2.7 <br /> 2) ENVIRONMENTAL HEALTH DEPARTMENT(Staff Contact:Ted Tasiopoulos, [209]953-7698) <br /> a) The San Joaquin County Development Title Requirements listed below have been <br /> identified as pertinent to this project. Other requirements may also apply. These <br /> requirements cannot be modified. <br /> b) Any geotechnical drilling shall be conducted under permit and inspection by The <br /> Environmental Health Department (San Joaquin County Development Title, Section 9- <br /> 1115.3 and 9-1115.6). <br /> 3) DEPARTMENT OF PUBLIC WORKS (Staff Contact: Alex Chetley, [209]468-3000) <br /> a) The Traffic Impact Mitigation Fee shall be required for this application. The fee is due and <br /> payable at the time of building permit application. The fee shall be automatically adjusted <br /> July 1 of each year by the Engineering Construction Cost Index as published by the <br /> Engineering News Record. (Resolution R-00-433) <br /> Informational Notes: <br /> i) A Solid Waste Diversion Plan for all applicable projects must be submitted to the <br /> Building Division of the Community Development Department prior to issuance of the <br /> building permit. Contact the Solid Waste Division (468-3066)for information. <br /> ii) This property is subject to the requirements of San Joaquin County Mosquito &Vector <br /> Control District (209-982-4675) and the California Health and Safety Code for the <br /> prevention of mosquitoes. Best Management Practices (BMP) guidelines for <br /> stormwater devices, ponds and wetlands are available. <br /> 4) MOUNTAIN HOUSE COMMUNITY SERVICES DISTRICT-(Staff Contact: Anthony Docto, [209] <br /> 831-2300) <br /> a) The Park and Ride lot is a condition of the Wicklund Village Tentative Map. Per the attached <br /> letter from Mr. Paul Sensibaugh, MHCSD General Manager, May 3, 2005, the Park and <br /> Ride lot is deferred to the time of the development of the Community Commercial Shopping <br /> Center along Central Parkway and Arnaudo Boulevard. Therefore, the Park and Ride lot <br /> shall be a condition of approval associated with development of the Community <br /> Commercial Shopping Center along Central Parkway and Arnaudo Boulevard. <br /> b) Traffic signals at Providence Street and Arnaudo Boulevard/Tradition Street and Arnaudo <br /> Boulevard shall be required when warranted or triggered by the traffic study or a condition <br /> of approval for the Neighborhood F map. <br /> c) Construction of an 8-feet wide pedestrian/bike path shall be provided for all collector streets <br /> entering the Town Center. <br /> d) All construction activities shall be in compliance with the storm, sewer and water master <br /> plans. <br />