My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0007861
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
2600 - Land Use Program
>
PA-0800105
>
SU0007861
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2020 11:37:03 AM
Creation date
9/4/2019 10:03:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0007861
PE
2675
FACILITY_NAME
PA-0800105
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
APN
20106003
ENTERED_DATE
8/11/2009 12:00:00 AM
SITE_LOCATION
9999 S AUSTIN RD
RECEIVED_DATE
7/24/2009 12:00:00 AM
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\A\AUSTIN\9999\EIR PA-0800105\NOP.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
687
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Draft Supplemental Environmental Impact Report Page I-2 J <br /> Forward Inc.Landfill 2014 Expansion Project <br /> • Increase the remaining landfill capacity by approximately 32.0 million cubic yards (cy) to <br /> 1 <br /> approximately 54.0 million cubic yards (cy). All of the increase would be Class II landfill <br /> space and would extend the landfill closure date to approximately 20392. i <br /> J <br /> • Relocate approximately 3,000 feet of the South Fork of South Littlejohns Creek (which <br /> currently traverses the landfill) to the southeastern boundaries of the site to provide addi- <br /> tional separation of the creek from the landfill.The relocated creek will be approximately <br /> 3,200 feet in length. <br /> • Allow cannery waste processing in areas of site that are not being used for disposal at the <br /> time. J <br /> This prior expansion project would have allowed landfilling activities within 10,000 feet of the <br /> Stockton Metropolitan Airport, and required a four-fifths vote of the Board of Supervisors to <br /> override the County Airport Land Use Commission finding that this proposed expansion project <br /> was not in conformity with the 1993 San Joaquin County Airport Land Use Plan. This former <br /> project failed to achieve the required vote.The Board of Supervisors did vote,however, to certify <br /> the Forward Landfill Expansion Final Environmental Impact Report (San Joaquin County, May <br /> 2013) ("FEIR'� as having been prepared in accordance with the California Environmental Qual- <br /> ity Act and adequate for use for decision-making purposes. _ <br /> The 2014 Expansion Project described in this Supplemental EIR is a smaller increase in permit- <br /> ted landfilling capacity that does not include the previously proposed horizontal expansion of <br /> landfilling operations on the 184-acre Brocchini parcel.The additional proposed landfill acreage <br /> is entirely within the boundary of the 567-acres permitted under the current land use permit (UP- <br /> 00-0007/ER-00-0002) approved by the Board of Supervisors on April 8,2003.The 2014 Expan- <br /> sion Project would not entail disposal of putrescible waste (waste streams other than concrete, <br /> rock, asphalt,wood and yard waste) in the Outer Approach and Climbout Areas of the Stockton <br /> Metropolitan Airport, expansion of landfilling operations to within 10,000 feet of the end of the <br /> runway of the Stockton Metropolitan Airport, or expansion of landfilling operations on to any <br /> parcels of land under Williamson Act contract. <br /> The 2014 Expansion Project proposes the following changes: <br /> • Eliminate the previously proposed landfill expansion onto the 184-acre Brocchini parcel. <br /> It would only allow the construction of landfill disposal cells and landfilling operations on <br /> an 8.7-acre portion of the approximately 10 acres in the northeast corner of the site. In <br /> addition,approximately 6.2 acres of landfill disposal area would be added to the currently <br /> permitted landfill footprint in the south area by expanding the existing disposal footprint — <br /> (partially used for existing composting facility) to the north and realigning the South Fork <br /> of South Littlejohns Creek to the southern and eastern boundary of the site). This would <br /> increase total landfill capacity (beyond currently permitted levels) by approximately 8.0 <br /> million cubic yards (instead of the previously proposed 32 million-cubic-yard expansion). <br /> All of the increase would be Class II landfill space,to allow the expansion area to accept <br /> both Class II and Class III waste. J <br /> 2 The 2013 FEIR estimated closure dates with and without that project of 2039 and 2021,respectively. However,2014 estimated closure dates J <br /> with and without the 2012(previously proposed)project are 2045 and 2026,respectively. <br />
The URL can be used to link to this page
Your browser does not support the video tag.