Laserfiche WebLink
Draft Supplemental Environmental Impact Report Page II-4 <br /> Forward Inc. Landfill 2014 Expansion Project <br /> Table S-1 <br /> SUMMARY OF IMPACTS AND MITIGATION MEASURES <br /> ENVIRONMENTAL MITIGATION MEASURE LEVEL OF <br /> IMPACT SIGNIFICANCE <br /> AFTER <br /> MITIGATION <br /> A. LAND USE, <br /> PLANS,AND <br /> POLICIES <br /> A.I. Compliance with Mitigation Measure A.1• (Implement Annual Gull Control Program): The project Less Than <br /> County Plans and sponsor shall implement an annual gull control program as described in Rolph A. Significant <br /> Policies. Davis, Ph.D. LGL Limited environmental research associates, Demonstration of the <br /> Continued Effectiveness of the Bird Control Program at the Forward Landfill, <br /> Manteca, California-2012-2013,30 December 2013. <br /> The gull control program shall include monitoring of gulls feeding at or using the <br /> landfill, as described below. <br /> • Monitoring shall be conducted by an independent third-party firm or <br /> individual with experience in the field of bird hazards to aircraft safety. <br /> • The third party monitoring shall consist of a minimum of six site visits, <br /> each lasting four hours, every month from October through May. To the <br /> extent possible, the site visits shall be announced in advance. During <br /> each month: <br /> o two of the visits shall begin at dawn, <br /> o two shall occur during mid-day, <br /> I ( I J 1 l I 1 f ; ► i I � <br />