My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0007861
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
2600 - Land Use Program
>
PA-0800105
>
SU0007861
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2020 11:37:03 AM
Creation date
9/4/2019 10:03:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0007861
PE
2675
FACILITY_NAME
PA-0800105
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
APN
20106003
ENTERED_DATE
8/11/2009 12:00:00 AM
SITE_LOCATION
9999 S AUSTIN RD
RECEIVED_DATE
7/24/2009 12:00:00 AM
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\A\AUSTIN\9999\EIR PA-0800105\NOP.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
687
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Draft Supplemental Environmental Impact Report Page 11-14 <br /> Forward Inc. Landfill 2014 Expansion Project <br /> equipment leaving the site. <br /> • Install wind breaks at windward side(s) of construction areas. <br /> • Suspend excavation and grading activity when winds exceed 20 mph. <br /> • Limit area subject to excavation,grading, and other construction activity at <br /> any one time. <br /> The applicant shall implement feasible control measures during construction to <br /> mitigate NOx and ROG emissions from construction equipment,which may include: <br /> • Require construction equipment used at the site to be equipped with <br /> catalysts/particulate traps to reduce particulate emissions. These <br /> catalysts/traps require the use of ultra-low sulfur diesel fuel (15 ppm). <br /> Currently, CARB has verified a limited number of these devices for <br /> installation in several diesel engine families to reduce particulate emissions. <br /> At the time bids are made, contractors must show that the construction <br /> equipment used is equipped with particulate filters and/or catalysts or <br /> prove why it is infeasible. <br /> • Use alternative fueled construction equipment, where feasible. <br /> • Replace fossil-fueled equipment with electrically driven equivalents (provided <br /> they are not run via a portable generator set). <br /> • Curtail construction during periods of high ambient pollutant concentrations; <br /> this may include ceasing of construction activity during the peak-hour of <br /> vehicular traffic on adjacent roadways. <br /> • Require that all diesel engines be shut off when not in use on the premises for <br /> more than five minutes to reduce the emissions from idling. <br /> 15.2. The project would Mitigation Measure D.2a. (Revises 2013 EIR Mitigation Measure D.2a.): The Less than <br /> result in an increase in applicant shall comply with SJVAPCD Rule 2201 regulations to offset stationary Significant <br /> operational emissions of source emissions of VOCs, CO, NO,, SO,,, PM�o and PM2.5 in excess of the applicable <br /> criteria air pollutants SJVAPCD thresholds. The applicant shall also comply with Regulation VIII and <br /> from onsite emission implement Mitigation Measure D.1 for operational activities such as earthmoving. <br />
The URL can be used to link to this page
Your browser does not support the video tag.