Laserfiche WebLink
- - � <br /> implemented, the landfill would revert to the jua indiction of )(III )oa�luril C_cunt� and the, <br /> County Sheriff's Department �voufd be responsible for police prt>tection. As discussed in the <br /> EIR;the existing landfill Inas haci relatively' low le�'el r,f pr lice service calls in the pa'st, It is not <br /> anticipated that continuation of operations at the larndfill expansion would suhstar�tially affect <br /> the need for police protection. Although the impacts before mitigatn>n are less thaiz significant, <br /> Mitigation lvleasures C.2 (a), (b), (c), (d), (e), and (f) ui the Mitigation'Nloniturislg/Reporting <br /> Program, would further reduce the level of adverse impacts. <br /> c. No Impact: The proposed prosect vvould not affect schools or dennand for schools. <br /> could not affect parks. <br /> d. No Impact: The proposed protect � } <br /> e. Less Than Significant With Mitigation Incorporation: A,, stated in the EIR, tile,proposed <br /> project would expand landfill activities within 1(),000 feet of a Stockton Metropolitan Airport <br /> runway, with possible bird hazard to aircraft. This impact, after. Mitigation Measures A.3.(a), <br /> (b), {c), and (d) of the Mitigation Monitoring/P.epus ting Program, �vuulci not be significant. <br /> The project also would be adjacent to a parcel containing several jtavesnile anis adult detention <br /> facilities (prison,,). The expansion project ��'ould include a L�orrow pit on the CYA parcel,and <br /> relocation of the creek nearer the prison site's, but no 1 Moral expan's.ion lit the landfill on the <br /> CYA parcel. Therefore. the protect vvou4d not adve rsek affect this public facility. <br /> XIV, RECREATION <br /> a. No Impact: The proposed project would not increase use.of parks or other recreational <br /> facilities. <br /> b. No hnipact: The proposed project does riot include recreational facilities or-;require the <br /> construction or exparz5ioil of recreakional facilities. <br /> XV. TRANSPORTATION/TRAFFIC <br /> a. Pateaztial.ly Significant Impact: The proposed iandfill expansion could substantially increase <br /> traffic. This issue is analvzed in the Supplemental EIR. <br /> a ,s .d iandfil l ev passion could exceed count\' level of <br /> b. Potentially Significant Impact: The prr } r _e F - <br /> service standards. This issue is analyzed in the Supplemental EIP.. <br /> c. Less Than Significant impact: The proposed landfill expansion.vvould nut affect air traffic <br /> Patterns. <br /> d. Less Than Significant Inipact: The proposed landfi.I.1 eapai)'s.ion slay increase hazards. This <br /> issue is assessed in the EIR. <br /> e. Less Than Significant impact: Tile proposed landfill expansion tivould not affect emergency <br /> access. <br /> f. Less Than Significant Impact: The proposed project would not result in inadequate parking <br /> capacity. <br /> g. Less Than Significant lrnpact: The proposed project would I)ot affect alternative <br />